 | 2009 |
| 10 |  | Anantaram Balakrishnan,
Prakash Mirchandani,
Harihara Prasad Natarajan:
Connectivity Upgrade Models for Survivable Network Design.
Operations Research 57(1): 170-186 (2009) |
| 2004 |
| 9 |  | Anantaram Balakrishnan,
Thomas L. Magnanti,
Prakash Mirchandani:
Connectivity-splitting models for survivable network design.
Networks 43(1): 10-27 (2004) |
| 2003 |
| 8 |  | Anantaram Balakrishnan,
Joseph Geunes:
Production Planning with Flexible Product Specifications: An Application to Specialty Steel Manufacturing.
Operations Research 51(1): 94-112 (2003) |
| 2002 |
| 7 |  | Anantaram Balakrishnan,
Thomas L. Magnanti,
Joel S. Sokol,
Yi Wang:
Spare-Capacity Assignment For Line Restoration Using a Single-Facility Type.
Operations Research 50(4): 617-635 (2002) |
| 2001 |
| 6 |  | Anantaram Balakrishnan,
Thomas L. Magnanti,
Joel S. Sokol,
Yi Wang:
Telecommunication Link Restoration Planning with Multiple Facility Types.
Annals OR 106(1-4): 127-154 (2001) |
| 5 |  | Anantaram Balakrishnan,
Thomas L. Magnanti,
Prakash Mirchandani:
Intuitive solution-doubling techniques for worst-case analysis of some survivable network design problems.
Oper. Res. Lett. 29(3): 99-106 (2001) |
| 1999 |
| 4 |  | Anantaram Balakrishnan,
Soundar R. T. Kumara,
Shankar Sundaresan:
Manufacturing in the Digital Age: Exploiting Information Technologies for Product Realization.
Information Systems Frontiers 1(1): 25-50 (1999) |
| 1996 |
| 3 |  | Anantaram Balakrishnan,
Srimathy Gopalakrishnan:
Selecting Ingot Sizes for Joint Production of Sheet Products.
INFORMS Journal on Computing 8(3): 260-273 (1996) |
| 1992 |
| 2 |  | Anantaram Balakrishnan,
Kemal Altinkemer:
Using a Hop-Constrained Model to Generate Alternative Communication Network Design.
INFORMS Journal on Computing 4(2): 192-205 (1992) |
| 1991 |
| 1 |  | Anantaram Balakrishnan,
Andrew B. Whinston:
Information Issues in Model Specification.
Information Systems Research 2(4): 263-286 (1991) |