| 2009 | ||
|---|---|---|
| 4 | Ruay-Shiung Chang, Jih-Sheng Chang, Po-Sheng Lin: An ant algorithm for balanced job scheduling in grids. Future Generation Comp. Syst. 25(1): 20-27 (2009) | |
| 2008 | ||
| 3 | Jih-Sheng Chang, Ruay-Shiung Chang: An Innovative Replica Consistency Model in Data Grids. ISPA 2008: 3-10 | |
| 2007 | ||
| 2 | Ruay-Shiung Chang, Jih-Sheng Chang, Shin-Yi Lin: Job scheduling and data replication on data grids. Future Generation Comp. Syst. 23(7): 846-860 (2007) | |
| 2006 | ||
| 1 | Ruay-Shiung Chang, Jih-Sheng Chang: Adaptable Replica Consistency Service for Data Grids. ITNG 2006: 646-651 | |
| 1 | Ruay-Shiung Chang | [1] [2] [3] [4] |
| 2 | Po-Sheng Lin | [4] |
| 3 | Shin-Yi Lin | [2] |