| 2002 | ||
|---|---|---|
| 3 | Shi-Zheng Eric Lin, Chieh Changfan, Yu-Chin Hsu, Fur-Shing Tsai: Optimal time borrowing analysis and timing budgeting optimization for latch-based designs. ACM Trans. Design Autom. Electr. Syst. 7(1): 217-230 (2002) | |
| 2000 | ||
| 2 | Chieh Changfan, Yu-Chin Hsu, Fur-Shing Tsai: Timing optimization on routed designs with incremental placementand routing characterization. IEEE Trans. on CAD of Integrated Circuits and Systems 19(2): 188-196 (2000) | |
| 1999 | ||
| 1 | Chieh Changfan, Yu-Chin Hsu, Fur-Shing Tsai: Post-routing timing optimization with routing characterization. ISPD 1999: 30-35 | |
| 1 | Yu-Chin Hsu | [1] [2] [3] |
| 2 | Shi-Zheng Eric Lin | [3] |
| 3 | Fur-Shing Tsai | [1] [2] [3] |