 | 2007 |
| 14 |  | Zhi-Long Chen,
Nicholas G. Hall:
Supply Chain Scheduling: Conflict and Cooperation in Assembly Systems.
Operations Research 55(6): 1072-1089 (2007) |
| 2006 |
| 13 |  | Zhi-Long Chen,
Guruprasad Pundoor:
Order Assignment and Scheduling in a Supply Chain.
Operations Research 54(3): 555-572 (2006) |
| 12 |  | Zhi-Long Chen,
Hang Xu:
Dynamic Column Generation for Dynamic Vehicle Routing with Time Windows.
Transportation Science 40(1): 74-88 (2006) |
| 2004 |
| 11 |  | Zhi-Long Chen:
Simultaneous Job Scheduling and Resource Allocation on Parallel Machines.
Annals OR 129(1-4): 135-153 (2004) |
| 2003 |
| 10 |  | Hang Xu,
Zhi-Long Chen,
Srinivas Rajagopal,
Sundar Arunapuram:
Solving a Practical Pickup and Delivery Problem.
Transportation Science 37(3): 347-364 (2003) |
| 2002 |
| 9 |  | T. C. Edwin Cheng,
Zhi-Long Chen,
Natalia V. Shakhlevich:
Common due date assignment and scheduling with ready times.
Computers & OR 29(14): 1957-1967 (2002) |
| 8 |  | Zhi-Long Chen,
Shanling Li,
Devanath Tirupati:
A scenario-based stochastic programming approach for technology and capacity planning.
Computers & OR 29(7): 781-806 (2002) |
| 2001 |
| 7 |  | Feng Zhang,
Guochun Tang,
Zhi-Long Chen:
A 3/2-approximation algorithm for parallel machine scheduling with controllable processing times.
Oper. Res. Lett. 29(1): 41-47 (2001) |
| 1999 |
| 6 |  | Zhi-Long Chen,
Warren B. Powell:
Solving Parallel Machine Scheduling Problems by Column Generation.
INFORMS Journal on Computing 11(1): 78-94 (1999) |
| 1997 |
| 5 |  | Zhi-Long Chen:
Parallel Machine Scheduling with Time Dependent Processing Times.
Discrete Applied Mathematics 75(1): 103 (1997) |
| 4 |  | Zhi-Long Chen,
Warren B. Powell:
A note on Bertsekas' small-label-first strategy.
Networks 29(2): 111-116 (1997) |
| 3 |  | Zhi-Long Chen,
Qing Lu,
Guochun Tang:
Single machine scheduling with discretely controllable processing times.
Oper. Res. Lett. 21(2): 69-76 (1997) |
| 1995 |
| 2 |  | Chung-Lun Li,
T. C. Edwin Cheng,
Zhi-Long Chen:
Single-machine scheduling to minimize the weighted number of early and tardy agreeable jobs.
Computers & OR 22(2): 205-219 (1995) |
| 1994 |
| 1 |  | T. C. Edwin Cheng,
Zhi-Long Chen,
Ceyda Oguz:
One-machine batching and sequencing of multiple-type items.
Computers & OR 21(7): 717-721 (1994) |