 | 2009 |
| 16 |  | Luis F. Zuluaga,
Javier Peña,
Donglei Du:
Third-order extensions of Lo's semiparametric bound for European call options.
European Journal of Operational Research 198(2): 557-570 (2009) |
| 2008 |
| 15 |  | Tianping Shuai,
Donglei Du,
Xiaoyue Jiang:
An Optimal On-Line Algorithm for Preemptive Scheduling on Two Uniform Machines in the lp Norm.
AAIM 2008: 316-327 |
| 14 |  | Tianping Shuai,
Donglei Du:
A Lower Bound for the On-Line Preemptive Machine Scheduling with lp.
COCOON 2008: 661-669 |
| 13 |  | Qiaoming Han,
Donglei Du,
Juan Vera,
Luis F. Zuluaga:
Improved Bounds for the Symmetric Rendezvous Value on the Line.
Operations Research 56(3): 772-782 (2008) |
| 2007 |
| 12 |  | Weimin Miao,
Hongxia Yin,
Donglei Du,
Jiye Han:
Robust Optimization Model for a Class of Uncertain Linear Programs.
ESCAPE 2007: 384-395 |
| 11 |  | Qiaoming Han,
Donglei Du,
Juan Vera,
Luis F. Zuluaga:
Improved bounds for the symmetric rendezvous value on the line.
SODA 2007: 69-78 |
| 10 |  | Santosh N. Kabadi,
Donglei Du:
On-line Network Synthesis.
Algorithmic Operations Research 2(1): (2007) |
| 9 |  | Donglei Du,
R. Chandrasekaran:
The maximum residual flow problem: NP-hardness with two-arc destruction.
Networks 50(3): 181-182 (2007) |
| 2006 |
| 8 |  | Zhonghang Xia,
I-Ling Yen,
Donglei Du,
Peng Li:
An integrated admission control scheme for the delivery of streaming media.
J. Parallel Distrib. Comput. 66(3): 334-344 (2006) |
| 7 |  | Donglei Du,
R. Chandrasekaran:
The multiroute maximum flow problem revisited.
Networks 47(2): 81-92 (2006) |
| 6 |  | Donglei Du,
Santosh N. Kabadi:
An improved algorithm for decomposing arc flows into multipath flows.
Oper. Res. Lett. 34(1): 53-57 (2006) |
| 5 |  | Dachuan Xu,
Donglei Du:
The k-level facility location game.
Oper. Res. Lett. 34(4): 421-426 (2006) |
| 2004 |
| 4 |  | Ruiming Li,
Dian Zhou,
Donglei Du:
Satisfiability and integer programming as complementary tools.
ASP-DAC 2004: 879-882 |
| 3 |  | Donglei Du:
Optimal preemptive semi-online scheduling on two uniform processors.
Inf. Process. Lett. 92(5): 219-223 (2004) |
| 2001 |
| 2 |  | Bo Chen,
Donglei Du,
Jiye Han,
Jianjun Wen:
On-line scheduling of small open shops.
Discrete Applied Mathematics 110(2-3): 133-150 (2001) |
| 1998 |
| 1 |  | Jianjun Wen,
Donglei Du:
Preemptive on-line scheduling for two uniform processors.
Oper. Res. Lett. 23(3-5): 113-116 (1998) |