 | 2009 |
| 8 |  | F. I. Dehayem Nodem,
Jean-Pierre Kenné,
Anis Gharbi:
Hierarchical decision making in production and repair/replacement planning with imperfect repairs under uncertainties.
European Journal of Operational Research 198(1): 173-189 (2009) |
| 2008 |
| 7 |  | Lotfi Hidri,
Anis Gharbi,
Mohamed Haouari:
Energetic reasoning revisited: application to parallel machine scheduling.
J. Scheduling 11(4): 239-252 (2008) |
| 2007 |
| 6 |  | Anis Gharbi,
Mohamed Haouari:
An approximate decomposition algorithm for scheduling on parallel machines with heads and tails.
Computers & OR 34(3): 868-883 (2007) |
| 5 |  | Jean-Pierre Kenné,
Anis Gharbi,
M. Beit:
Age-dependent production planning and maintenance strategies in unreliable manufacturing systems with lost sale.
European Journal of Operational Research 178(2): 408-420 (2007) |
| 2005 |
| 4 |  | Anis Gharbi,
Mohamed Haouari:
Optimal parallel machines scheduling with availability constraints.
Discrete Applied Mathematics 148(1): 63-87 (2005) |
| 3 |  | Mohamed Haouari,
Anis Gharbi:
Fast lifting procedures for the bin packing problem.
Discrete Optimization 2(3): 201-218 (2005) |
| 2004 |
| 2 |  | Mohamed Haouari,
Anis Gharbi:
Lower Bounds for Scheduling on Identical Parallel Machines with Heads and Tails.
Annals OR 129(1-4): 187-204 (2004) |
| 2003 |
| 1 |  | Mohamed Haouari,
Anis Gharbi:
An improved max-flow-based lower bound for minimizing maximum lateness on identical parallel machines.
Oper. Res. Lett. 31(1): 49-52 (2003) |