 | 2010 |
| 21 |  | Paolo Priore,
José Parreño,
Raúl Pino,
Alberto Gomez,
Javier Puente:
Learning-Based Scheduling of Flexible Manufacturing Systems Using Support Vector Machines.
Applied Artificial Intelligence 24(3): 194-209 (2010) |
| 2009 |
| 20 |  | Raúl Pino,
David de la Fuente,
Alberto Gomez,
Javier Puente:
Multi-Agent Simulation to Optimizing Supply Chain Management.
IC-AI 2009: 806-810 |
| 2008 |
| 19 |  | Alberto Gomez,
Ruben Cuevas,
David de la Fuente,
José Parreño,
Paolo Priore:
New Metaheuristic for the Job Shop Scheduling Problem with PSO.
IC-AI 2008: 552-553 |
| 18 |  | Isabel Fernández,
Javier Puente,
Nazario García,
Alberto Gomez:
A Decision-Making Support System on a Products Recovery Management Framework. A Fuzzy Approach.
Concurrent Engineering: R&A 16(2): 129-138 (2008) |
| 2006 |
| 17 |  | David de la Fuente,
Alejandro Garrido,
Jaime Laviada,
Alberto Gomez:
Genetic algorithms to optimise the time to make stock market investment.
GECCO 2006: 1857-1858 |
| 16 |  | Alberto Gomez,
David de la Fuente,
Javier Puente,
José Parreño:
A case-study about shift work management at a hospital emergency department with genetic algorithms.
GECCO 2006: 1867-1868 |
| 15 |  | Alberto Gomez,
Ricardo Gonzalez,
José Parreño,
Raúl Pino:
A Particle Swarm-based Metaheuristic to Solve the Travelling Salesman Problem.
IC-AI 2006: 698-702 |
| 14 |  | Javier Puente,
Alberto Gomez,
David de la Fuente,
Alejandro Garrido:
A New Heuristic for Shift Work Management.
IC-AI 2006: 703-710 |
| 2005 |
| 13 |  | Joaquín Bautista,
Alberto Gomez,
Jordi Pereira,
Jesús Lozano Mosterín:
Comparison Between Metaheuristic and Exact Models in the Packing Problem Resolution.
IC-AI 2005: 435-441 |
| 12 |  | Alberto Gomez,
José Parreño,
David de la Fuente,
Paolo Priore:
Solution to the Student Transportation Problem in a Spanish University with Metaheuristic Algorithms.
IC-AI 2005: 876-880 |
| 11 |  | Alberto Gomez,
David de la Fuente,
Paolo Priore,
Javier Puente:
Heuristic to optimize L-guillotine cutting operations.
AI EDAM 19(1): 33-38 (2005) |
| 2004 |
| 10 |  | Alberto Gomez,
David de la Fuente,
Joaquín Bautista,
Jordi Pereira,
Laia Ferrer:
A Comparative Study of Simulated Annealing and Genetic Algorithms.
IC-AI 2004: 3-9 |
| 2003 |
| 9 |  | Alberto Gomez,
David de la Fuente,
M. Antonia Castells,
Javier Puente:
Resolution of Loading and Scheduling Problems in FMS.
IC-AI 2003: 815-819 |
| 8 |  | Ramiro Varela,
Camino R. Vela,
Jorge Puente,
Alberto Gomez:
A knowledge-based evolutionary strategy for scheduling problems with bottlenecks.
European Journal of Operational Research 145(1): 57-71 (2003) |
| 2002 |
| 7 |  | Alberto Gomez,
David de la Fuente,
José Parreño,
Javier Puente:
Using Genetic Algorithms To Optimize Guillotine Cutting Operations.
GECCO 2002: 1265 |
| 6 |  | Alberto Gomez,
Raúl Pino,
Nazario García,
Isabel Fernández:
Heuristic for Cutting Operations.
IC-AI 2002: 239-244 |
| 2001 |
| 5 |  | Paolo Priore,
David de la Fuente,
Alberto Gomez,
Javier Puente:
A review of machine learning in dynamic scheduling of flexible manufacturing systems.
AI EDAM 15(3): 251-263 (2001) |
| 4 |  | Paolo Priore,
David de la Fuente,
Alberto Gomez,
Javier Puente:
Dynamic Scheduling of Manufacturing Systems with Machine Learning.
Int. J. Found. Comput. Sci. 12(6): 751-762 (2001) |
| 1999 |
| 3 |  | Ramiro Varela,
Alberto Gomez,
Camino R. Vela,
Jorge Puente,
Cesar Alonso:
Heuristic Generation of the Initial Population in Solving Job Shop Problems by Evolutionary Strategies.
IWANN (1) 1999: 690-699 |
| 2 |  | Alberto Gomez,
David de la Fuente:
Solving the Packing and Strip-Packing Problems with Genetic Algorithms.
IWANN (1) 1999: 709-718 |
| 1998 |
| 1 |  | Alberto Gomez,
David de la Fuente,
Javier Puente:
Solving the Packing Problem with Genetic Algorithms.
NC 1998: 176-179 |