 | 2009 |
| 7 |  | Vladimir Kats,
Eugene Levner:
A polynomial algorithm for 2-cyclic robotic scheduling: A non-Euclidean case.
Discrete Applied Mathematics 157(2): 339-355 (2009) |
| 2008 |
| 6 |  | Vladimir Kats,
Eugene Levner:
Parametric Algorithms for Cyclic Scheduling Problems with Applications to Robotics.
MICAI 2008: 653-663 |
| 5 |  | Vladimir Kats,
Lei Lei,
Eugene Levner:
Minimizing the cycle time of multiple-product processing networks with a fixed operation sequence, setups, and time-window constraints.
European Journal of Operational Research 187(3): 1196-1211 (2008) |
| 2007 |
| 4 |  | David Alcaide,
Chengbin Chu,
Vladimir Kats,
Eugene Levner,
Gerard Sierksma:
Cyclic multiple-robot scheduling with time-window constraints using a critical path approach.
European Journal of Operational Research 177(1): 147-162 (2007) |
| 2006 |
| 3 |  | Vladimir Kats,
Eugene Levner:
A Polynomial Algorithm for 2-Cyclic Robotic Scheduling.
MICAI 2006: 439-449 |
| 1998 |
| 2 |  | Eugene Levner,
Vladimir Kats:
A Parametric Critical Path Problem and an Application for Cyclic Scheduling.
Discrete Applied Mathematics 87(1-3): 149-158 (1998) |
| 1997 |
| 1 |  | Vladimir Kats,
Eugene Levner:
A strongly polynomial algorithm for no-wait cyclic robotic flowshop scheduling.
Oper. Res. Lett. 21(4): 171-179 (1997) |