 | 2009 |
| 14 |  | Seong-Woo Choi,
Yeong-Dae Kim:
Minimizing total tardiness on a two-machine re-entrant flowshop.
European Journal of Operational Research 199(2): 375-384 (2009) |
| 13 |  | Yeong-Dae Kim,
Byung-Jun Joo,
Jong-Ho Shin:
Heuristics for a two-stage hybrid flowshop scheduling problem with ready times and a product-mix ratio constraint.
J. Heuristics 15(1): 19-42 (2009) |
| 2008 |
| 12 |  | June-Young Bang,
Jae-Hun Kang,
Bong-Kyun Kim,
Yeong-Dae Kim:
Multi-product lot merging/splitting algorithms for a semiconductor wafer fabrication.
Winter Simulation Conference 2008: 2209-2215 |
| 11 |  | Sang-Oh Shim,
Yeong-Dae Kim:
A branch and bound algorithm for an identical parallel machine scheduling problem with a job splitting property.
Computers & OR 35(3): 863-875 (2008) |
| 10 |  | Seong-Woo Choi,
Yeong-Dae Kim:
Minimizing makespan on an m-machine re-entrant flowshop.
Computers & OR 35(5): 1684-1696 (2008) |
| 9 |  | Truong Ton Hien Duc,
Huynh Trung Luong,
Yeong-Dae Kim:
A measure of bullwhip effect in supply chains with a mixed autoregressive-moving average demand process.
European Journal of Operational Research 187(1): 243-256 (2008) |
| 2007 |
| 8 |  | Ho-Joo Lee,
Yeong-Dae Kim:
Heuristics for search sequencing under time-dependent probabilities of existence.
Computers & OR 34(7): 2010-2024 (2007) |
| 7 |  | Sang-Oh Shim,
Yeong-Dae Kim:
Scheduling on parallel identical machines to minimize total tardiness.
European Journal of Operational Research 177(1): 135-146 (2007) |
| 2004 |
| 6 |  | Seong-Hoon Choi,
Yeong-Dae Kim:
Reallocation of paths of ABR services in a multistage interconnection network (MIN)-type ATM switch network.
European Journal of Operational Research 159(1): 207-218 (2004) |
| 2003 |
| 5 |  | Jae-Gon Kim,
Yeong-Dae Kim:
A linear programming-based algorithm for floorplanning in VLSI design.
IEEE Trans. on CAD of Integrated Circuits and Systems 22(5): 584-592 (2003) |
| 1998 |
| 4 |  | Moon-Won Park,
Yeong-Dae Kim:
A systematic procedure for setting parameters in simulated annealing algorithms.
Computers & OR 25(3): 207-217 (1998) |
| 1996 |
| 3 |  | Jung-Ug Kim,
Yeong-Dae Kim:
Simulated annealing and genetic algorithms for scheduling products with multi-level product structure.
Computers & OR 23(9): 857-868 (1996) |
| 1995 |
| 2 |  | Yeong-Dae Kim:
A backward approach in list scheduling algorithms for multi-machine tardiness problems.
Computers & OR 22(3): 307-319 (1995) |
| 1993 |
| 1 |  | Yeong-Dae Kim:
A new branch and bound algorithm for minimizing mean tardiness in two-machine flowshops.
Computers & OR 20(4): 391-401 (1993) |