 | 2009 |
| 9 |  | Li-Yu D. Liu,
Chien-Yu Chen,
Mei-Ju M. Chen,
Ming-Shian Tsai,
Cho-Han S. Lee,
Tzu L. Phang,
Li-Yun Chang,
Wen-Hung Kuo,
Hsiao-Lin Hwa,
Huang-Chun Lien,
Shih-Ming Jung,
Yi-Shing Lin,
King-Jen Chang,
Fon-Jou Hsieh:
Statistical identification of gene association by CID in application of constructing ER regulatory network.
BMC Bioinformatics 10: (2009) |
| 2008 |
| 8 |  | Dar-Li Yang,
Chou-Jung Hsu,
Wen-Hung Kuo:
A two-machine flowshop scheduling problem with a separated maintenance constraint.
Computers & OR 35(3): 876-883 (2008) |
| 7 |  | Dar-Li Yang,
Wen-Hung Kuo,
Maw-Sheng Chern:
Multi-family scheduling in a two-machine reentrant flow shop with setups.
European Journal of Operational Research 187(3): 1160-1170 (2008) |
| 6 |  | Wen-Hung Kuo,
Dar-Li Yang:
Parallel-machine scheduling with time dependent processing times.
Theor. Comput. Sci. 393(1-3): 204-210 (2008) |
| 2007 |
| 5 |  | Wen-Hung Kuo,
Dar-Li Yang:
Single machine scheduling with past-sequence-dependent setup times and learning effects.
Inf. Process. Lett. 102(1): 22-26 (2007) |
| 2006 |
| 4 |  | Wen-Hung Kuo,
Dar-Li Yang:
Single-machine group scheduling with a time-dependent learning effect.
Computers & OR 33: 2099-2112 (2006) |
| 3 |  | Wen-Hung Kuo,
Dar-Li Yang:
Minimizing the total completion time in a single-machine scheduling problem with a time-dependent learning effect.
European Journal of Operational Research 174(2): 1184-1190 (2006) |
| 2 |  | Wen-Hung Kuo,
Dar-Li Yang:
Minimizing the makespan in a single machine scheduling problem with a time-based learning effect.
Inf. Process. Lett. 97(2): 64-67 (2006) |
| 1999 |
| 1 |  | Wen-Hung Kuo:
The development of a human-computer interactive scheduling system.
Int. J. Computer Integrated Manufacturing 12(2): 156-167 (1999) |