| 2009 | ||
|---|---|---|
| 63 | Jian Zhai, Qiusong Yang, Feng Su, Junchao Xiao, Qing Wang, Mingshu Li: Stochastic Process Algebra Based Software Process Simulation Modeling. ICSP 2009: 136-147 | |
| 62 | Qi Li, Mingshu Li, Ye Yang, Qing Wang, Thomas Tan, Barry W. Boehm, Chenyong Hu: Bridge the Gap between Software Test Process and Business Value: A Case Study. ICSP 2009: 212-223 | |
| 61 | Xiao Liu, Yun Yang, Jinjun Chen, Qing Wang, Mingshu Li: Achieving On-Time Delivery: A Two-Stage Probabilistic Scheduling Strategy for Software Projects. ICSP 2009: 317-329 | |
| 60 | Ye Yang, Qing Wang, Mingshu Li: Process Trustworthiness as a Capability Indicator for Measuring and Improving Software Trustworthiness. ICSP 2009: 389-401 | |
| 59 | Junchao Xiao, Qing Wang, Mingshu Li, Qiusong Yang, Lizi Xie, Dapeng Liu: Value-Based Multiple Software Projects Scheduling with Genetic Algorithm. ICSP 2009: 50-62 | |
| 58 | Kuien Liu, Ke Deng, Zhiming Ding, Mingshu Li, Xiaofang Zhou: MOIR/MT: Monitoring Large-Scale Road Network Traffic in Real-Time. PVLDB 2(2): 1538-1541 (2009) | |
| 2008 | ||
| 57 | Mei He, Ye Yang, Qing Wang, Mingshu Li: An Investigation on Performance of Software Enhancement Projects in China. APSEC 2008: 67-74 | |
| 56 | Qi Li, Qing Wang, Ye Yang, Mingshu Li: Reducing biases in individual software effort estimations: a combining approach. ESEM 2008: 223-232 | |
| 55 | Da Yang, Qing Wang, Mingshu Li, Ye Yang, Kai Ye, Jing Du: A survey on software cost estimation in the chinese software industry. ESEM 2008: 253-262 | |
| 54 | Ye Yang, Mei He, Mingshu Li, Qing Wang, Barry W. Boehm: Phase distribution of software development effort. ESEM 2008: 61-69 | |
| 53 | Junchao Xiao, Qing Wang, Mingshu Li, Ye Yang, Fan Zhang, Lizi Xie: A constraint-driven human resource scheduling method in software development and maintenance process. ICSM 2008: 17-26 | |
| 52 | Ye Yang, Qi Li, Mingshu Li, Qing Wang: An empirical analysis on distribution patterns of software maintenance effort. ICSM 2008: 456-459 | |
| 51 | Mingshu Li: An integrated solution for software process improvement. ICSM 2008: 472-473 | |
| 50 | Yin Li, Juan Li, Ye Yang, Mingshu Li: Requirement-Centric Traceability for Change Impact Analysis: A Case Study. ICSP 2008: 100-111 | |
| 49 | Lang Gou, Qing Wang, Jun Yuan, Ye Yang, Mingshu Li, Nan Jiang: Quantitatively Managing Defects for Iterative Projects: An Industrial Experience Report in China. ICSP 2008: 369-380 | |
| 48 | Mei He, Mingshu Li, Qing Wang, Ye Yang, Kai Ye: An Investigation of Software Development Productivity in China. ICSP 2008: 381-394 | |
| 47 | Fei Dong, Mingshu Li, Yuzhu Zhao, Juan Li, Ye Yang: Software Multi-project Resource Scheduling: A Comparative Analysis. ICSP 2008: 63-75 | |
| 46 | Thomas Tan, Mei He, Ye Yang, Qing Wang, Mingshu Li: An Analysis to Understand Software Trustworthiness. ICYCS 2008: 2366-2371 | |
| 45 | Jian Zhai, Qiusong Yang, Ye Yang, Junchao Xiao, Qing Wang, Mingshu Li: Automated Process Quality Assurance for Distributed Software Development. SEAFOOD 2008: 196-210 | |
| 44 | Jian Dai, Junchao Xiao, Qing Wang, Mingshu Li, Huaizhang Li: Dynamically Optimize Process Execution Based on Process-agent. SEKE 2008: 561-564 | |
| 43 | Nao Li, Mingshu Li, Qing Wang, Shuanzhu Du: A flexible negotiation model for an agent-based software process modelling. IJCAT 31(1/2): 64-73 (2008) | |
| 42 | Shujuan Lü, Mingshu Li: Modified Legendre rational spectral method for the Burgers equation on the half-line. Int. J. Comput. Math. 85(6): 865-875 (2008) | |
| 41 | Qing Wang, Lang Gou, Nan Jiang, Meiru Che, Ronghui Zhang, Yun Yang, Mingshu Li: Estimating fixing effort and schedule based on defect injection distribution. Software Process: Improvement and Practice 13(1): 35-50 (2008) | |
| 2007 | ||
| 40 | Juan Li, Nan Jiang, Mingshu Li, Qing Wang, Yanwu Yang: Tracking Projects through A Three-Dimensional Software Development Model. COMPSAC (1) 2007: 301-308 | |
| 39 | Qiusong Yang, Mingshu Li, Qing Wang, Guowei Yang, Jian Zhai, Juan Li, Lishan Hou, Yun Yang: An Algebraic Approach for Managing Inconsistencies in Software Processes, . ICSP 2007: 121-133 | |
| 38 | Mei He, Ye Yang, Qing Wang, Mingshu Li: Cost Estimation and Analysis for Government Contract Pricing in China. ICSP 2007: 134-146 | |
| 37 | Nao Li, Qing Wang, Mingshu Li, Shuanzhu Du, Junchao Xiao: A Multilateral Negotiation Method for Software Process Modeling. ICSP 2007: 147-158 | |
| 36 | Li Ruan, Yongji Wang, Qing Wang, Mingshu Li, Yun Yang, Lizi Xie, Dapeng Liu, Haitao Zeng, Shen Zhang, Junchao Xiao, Lei Zhang, M. Wasif Nisar, Jian Dai: Empirical Study on Benchmarking Software Development Tasks. ICSP 2007: 221-232 | |
| 35 | Qing Wang, Lang Gou, Nan Jiang, Meiru Che, Ronghui Zhang, Yun Yang, Mingshu Li: An Empirical Study on Establishing Quantitative Management Model for Testing Process. ICSP 2007: 233-245 | |
| 34 | Da Yang, Barry W. Boehm, Ye Yang, Qing Wang, Mingshu Li: Coping with the Cone of Uncertainty: An Empirical Study of the SAIV Process Model. ICSP 2007: 37-48 | |
| 33 | Lei Zhang, Qing Wang, Junchao Xiao, Li Ruan, Lizi Xie, Mingshu Li: A Tool to Create Process-Agents for OEC-SPM from Historical Project Data. ICSP 2007: 84-95 | |
| 32 | Mingshu Li: TRISO-Model: A New Approach to Integrated Software Process Assessment and Improvement. Software Process: Improvement and Practice 12(5): 387-398 (2007) | |
| 2006 | ||
| 31 | Mingshu Li, Meng Huang, Fengdi Shu, Juan Li: A risk-driven method for eXtreme programming release planning. ICSE 2006: 423-430 | |
| 30 | Qing Wang, Nan Jiang, Lang Gou, Xia Liu, Mingshu Li, Yongji Wang: BSR: a statistic-based approach for establishing and refining software process performance baseline. ICSE 2006: 585-594 | |
| 29 | Nao Li, Mingshu Li, Qing Wang, Shuanzhu Du: A Negotiation Model for the Process Agents in an Agent-Based Process-Centered Software Engineering Environment. SEKE 2006: 664-669 | |
| 28 | Mingshu Li, Qiusong Yang, Jian Zhai, Guowei Yang: On Mobility of Software Processes. SPW/ProSim 2006: 105-114 | |
| 27 | Da Yang, Yuxiang Wan, Zinan Tang, Shujian Wu, Mei He, Mingshu Li: COCOMO-U: An Extension of COCOMO II for Cost Estimation with Uncertainty. SPW/ProSim 2006: 132-141 | |
| 26 | Mingshu Li: Assessing 3-D Integrated Software Development Processes: A New Benchmark. SPW/ProSim 2006: 15-38 | |
| 25 | Qing Wang, Junchao Xiao, Mingshu Li, M. Wasif Nisar, Rong Yuan, Lei Zhang: A Process-Agent Construction Method for Software Process Modeling in SoftPM. SPW/ProSim 2006: 204-213 | |
| 24 | Feng Yuan, Mingshu Li, Zhigang Wan: SEM2XPDL: Towards SPEM Model Enactment. Software Engineering Research and Practice 2006: 240-245 | |
| 2005 | ||
| 23 | Mingshu Li, Barry W. Boehm, Leon J. Osterweil: Unifying the Software Process Spectrum, International Software Process Workshop, SPW 2005, Beijing, China, May 25-27, 2005, Revised Selected Papers Springer 2005 | |
| 22 | Qing Wang, Mingshu Li: Measuring and improving software process in China. ISESE 2005: 183-192 | |
| 21 | Qing Wang, Mingshu Li: Software Process Management: Practices in China. ISPW 2005: 317-331 | |
| 20 | Zhanchun Wu, David Christensen, Mingshu Li, Qing Wang: A Survey of CMM/CMMI Implementation in China. ISPW 2005: 507-520 | |
| 19 | Mingshu Li: Expanding the Horizons of Software Development Processes: A 3-D Integrated Methodology. ISPW 2005: 54-67 | |
| 18 | Xinpei Zhao, Keith Chan, Mingshu Li: Applying agent technology to software process modeling and process-centered software engineering environment. SAC 2005: 1529-1533 | |
| 2004 | ||
| 17 | Han Liu, Chao Li, Jizhe Wang, Qing Wang, Mingshu Li: A User-Oriented Model-Driven Requirements Elicitation Process based on User Modeling. Computer Supported Acitivity Coordination 2004: 174-184 | |
| 16 | Yuan Liao, Mingshu Li: A QoS-aware Component-Based Middleware for Pervasive Computing. ICESS 2004: 229-235 | |
| 15 | Wen-Jie Li, Mingshu Li, Qing Wang, Yongji Wang: VICOS: A Framework for Session Management in Network Computing Infrastructure. IEEE SCC 2004: 647-650 | |
| 14 | Juan Li, Mingshu Li, Zhanchun Wu, Qing Wang: A Metamodel for the CMM Software Process. ISPA 2004: 446-450 | |
| 13 | John Sum, Mingshu Li, Chung W. Ng, Tony Wong, Gilbert H. Young: A Study of the Connectedness of Gnutella. PDPTA 2004: 960-966 | |
| 12 | Ying Dong, Mingshu Li: HyO-XTM: a set of hyper-graph operations on XML Topic Map toward knowledge management. Future Generation Comp. Syst. 20(1): 81-100 (2004) | |
| 11 | Ying Dong, Mingshu Li: Mobile communications in China. IJMC 2(4): 395-404 (2004) | |
| 10 | Yongji Wang, Liu Han, Mingshu Li, Qing Wang, Jinhui Zhou, Matthew Cartmel: A real-time path planning approach without the computation of Cspace obstacles. Robotica 22(2): 173-187 (2004) | |
| 2003 | ||
| 9 | Chao Li, Han Liu, Jizhe Wang, Qing Wang, Mingshu Li: A Context-Aware User-Adaptive Supporting System for Goal-Oriented Requirements Elicitation Process. ICEIS (3) 2003: 347-356 | |
| 2002 | ||
| 8 | Ying Dong, Mingshu Li: TEMPPLET: A New Method for Domain-Specific Ontology Design. EDCIS 2002: 90-103 | |
| 7 | Guoqiang Shu, Chao Li, Qing Wang, Mingshu Li: Validating Objected-Oriented Prototype of Real-Time Systems with Timed Automata. IEEE International Workshop on Rapid System Prototyping 2002: 99- | |
| 6 | Ying Dong, John Hallam, Mingshu Li: On Constructing a Cooperative Paradigm. Applied Artificial Intelligence 16(3): 209-241 (2002) | |
| 5 | Ying Dong, Mingshu Li, Meizhang Chen, Shengli Zheng: Research on intellectual property right problems of peer-to-peer networks. The Electronic Library 20(2): 143-150 (2002) | |
| 2001 | ||
| 4 | Ying Dong, Mingshu Li: A Risk-Driven Design Model for Embedded System. APAQS 2001: 204-210 | |
| 3 | Chao Li, Han Li, Mingshu Li: A Software Factory Model Based on ISO9000 and CMM for Chinese Small Organizations. APAQS 2001: 288-294 | |
| 2 | Minzhe Zhao, Mingshu Li: T.120/H.32x-based Multimedia Conferencing Desig. CSCWD 2001: 146-148 | |
| 1999 | ||
| 1 | Mei Lu, Xinpei Zhao, Mingshu Li: Object-Oriented Requirements Modeling Based on UML. TOOLS (31) 1999: 133- | |