 | 2009 |
| 11 |  | Donald W. Hearn,
Timothy J. Lowe:
Lagrangian Duality: BASICS.
Encyclopedia of Optimization 2009: 1805-1813 |
| 10 |  | Timothy J. Lowe:
Network Location: Covering Problems.
Encyclopedia of Optimization 2009: 2545-2547 |
| 2008 |
| 9 |  | Samuel Burer,
Philip C. Jones,
Timothy J. Lowe:
Coordinating the supply chain in the agricultural seed industry.
European Journal of Operational Research 185(1): 354-377 (2008) |
| 2007 |
| 8 |  | Ann Melissa Campbell,
Timothy J. Lowe,
Li Zhang:
The p.
European Journal of Operational Research 176(2): 819-835 (2007) |
| 2006 |
| 7 |  | Ann Melissa Campbell,
Timothy J. Lowe,
Li Zhang:
Upgrading arcs to minimize the maximum travel time in a network.
Networks 47(2): 72-80 (2006) |
| 2004 |
| 6 |  | Richard L. Francis,
Timothy J. Lowe,
Arie Tamir,
H. Emir-Farinas:
A framework for demand point and solution space aggregation analysis for location models.
European Journal of Operational Research 159(3): 574-585 (2004) |
| 2002 |
| 5 |  | Ranganath Nuggehalli,
Timothy J. Lowe,
James E. Ward:
An Improved Lower Bound for the Multimedian Location Problem.
Annals OR 110(1-4): 17-31 (2002) |
| 4 |  | Richard L. Francis,
Timothy J. Lowe,
Arie Tamir:
Worst-case incremental analysis for a class of p-facility location problems.
Networks 39(3): 139-143 (2002) |
| 1997 |
| 3 |  | Vernon Ning Hsu,
Timothy J. Lowe,
Arie Tamir:
Structured p-facility location problems on the line solvable in polynomial time.
Oper. Res. Lett. 21(4): 159-164 (1997) |
| 1996 |
| 2 |  | Tae Ung Kim,
Timothy J. Lowe,
Arie Tamir,
James E. Ward:
On the location of a tree-shaped facility.
Networks 28(3): 167-175 (1996) |
| 1988 |
| 1 |  | Rex K. Kincaid,
Timothy J. Lowe,
Thomas L. Morin:
The location of central structures in trees.
Computers & OR 15(2): 103-113 (1988) |