| 2009 | ||
|---|---|---|
| 2 | Christian Bierwirth, Frank Meisel: A fast heuristic for quay crane scheduling with interference constraints. J. Scheduling 12(4): 345-360 (2009) | |
| 2005 | ||
| 1 | Frank Meisel, Christian Bierwirth: Integration of Berth Allocation and Crane Assignment to Improve the Resource Utilization at a Seaport Container Terminal. OR 2005: 105-110 | |
| 1 | Christian Bierwirth | [1] [2] |