 | 2008 |
| 7 |  | Yang Liu,
Yasser Mohamed:
Multi-Agent Resource Allocation (MARA) for modeling construction processes.
Winter Simulation Conference 2008: 2361-2369 |
| 6 |  | Hosein Taghaddos,
Simaan M. AbouRizk,
Yasser Mohamed,
Ivan Ourdev:
Distributed agent-based simulation of construction projects with HLA.
Winter Simulation Conference 2008: 2413-2420 |
| 2007 |
| 5 |  | Adham Shahin,
Simaan M. AbouRizk,
Yasser Mohamed,
Siri Fernando:
A simulation-based framework for quantifying the cold regions weather impacts on construction schedules.
Winter Simulation Conference 2007: 1798-1804 |
| 2004 |
| 4 |  | Tae Hwan Chung,
Yasser Mohamed,
Simaan M. AbouRizk:
Simulation Input Updating Using Bayesian Techniques.
Winter Simulation Conference 2004: 1238-1243 |
| 2002 |
| 3 |  | Simaan M. AbouRizk,
Yasser Mohamed:
CEPM 1: optimal construction project planning.
Winter Simulation Conference 2002: 1704-1708 |
| 2 |  | Bradford J. A. Appleton,
John Patra,
Yasser Mohamed,
Simaan M. AbouRizk:
CEPM 1: special purpose simulation modeling of tower cranes.
Winter Simulation Conference 2002: 1709-1715 |
| 2000 |
| 1 |  | Simaan M. AbouRizk,
Yasser Mohamed:
Simphony: an integrated environment for construction simulation.
Winter Simulation Conference 2000: 1907-1914 |