 | 2009 |
| 18 |  | Ceyda Oguz,
Kirk Pruhs:
Editorial.
J. Scheduling 12(5): 435-436 (2009) |
| 2008 |
| 17 |  | Pierre Hansen,
Ceyda Oguz,
Nenad Mladenovic:
Variable neighborhood search for minimum cost berth allocation.
European Journal of Operational Research 191(3): 636-649 (2008) |
| 2006 |
| 16 |  | Jacek Blazewicz,
Fred Glover,
Marta Kasprzak,
Wojciech T. Markiewicz,
Ceyda Oguz,
Dietrich Rebholz-Schuhmann,
Aleksandra Swiercz:
Dealing with repetitions in sequencing by hybridization.
Computational Biology and Chemistry 30(5): 313-320 (2006) |
| 15 |  | Jacek Blazewicz,
Ceyda Oguz,
Aleksandra Swiercz,
Jan Weglarz:
DNA Sequencing by Hybridization via Genetic Search.
Operations Research 54(6): 1185-1192 (2006) |
| 2005 |
| 14 |  | Jacek Blazewicz,
Beniamin Dziurdza,
Wojciech T. Markiewicz,
Ceyda Oguz:
The Parallel Genetic Algorithm for Designing DNA Randomizations in a Combinatorial Protein Experiment.
PPAM 2005: 1097-1105 |
| 13 |  | Muhammet Fikret Ercan,
Ceyda Oguz:
Performance of local search heuristics on scheduling a class of pipelined multiprocessor tasks.
Computers & Electrical Engineering 31(8): 537-555 (2005) |
| 12 |  | Yakov Zinder,
Van Ha Do,
Ceyda Oguz:
Computational complexity of some scheduling problems with multiprocessor tasks.
Discrete Optimization 2(4): 391-408 (2005) |
| 11 |  | Ceyda Oguz,
Muhammet Fikret Ercan:
A Genetic Algorithm for Hybrid Flow-shop Scheduling with Multiprocessor Tasks.
J. Scheduling 8(4): 323-351 (2005) |
| 2004 |
| 10 |  | Ceyda Oguz,
Yakov Zinder,
Van Ha Do,
Adam Janiak,
Maciej Lichtenstein:
Hybrid flow-shop scheduling problems with multiprocessor task systems.
European Journal of Operational Research 152(1): 115-131 (2004) |
| 2003 |
| 9 |  | Ceyda Oguz,
Yu-Fai Fung,
Muhammet Fikret Ercan,
X. T. Qi:
Parallel Genetic Algorithm for a Flow-Shop Problem with Multiprocessor Tasks.
ICCSA (1) 2003: 987-997 |
| 8 |  | Ceyda Oguz,
Yu-Fai Fung,
Muhammet Fikret Ercan,
X. T. Qi:
Parallel Genetic Algorithm for a Flow-Shop Problem with Multiprocessor Tasks.
International Conference on Computational Science 2003: 548-559 |
| 7 |  | Ceyda Oguz,
Muhammet Fikret Ercan,
T. C. Edwin Cheng,
Yu-Fai Fung:
Heuristic algorithms for multiprocessor task scheduling in a two-stage hybrid flow-shop.
European Journal of Operational Research 149(2): 390-403 (2003) |
| 2001 |
| 6 |  | Muhammet Fikret Ercan,
Ceyda Oguz,
Yu-Fai Fung:
Performance Evaluation of Heuristics for Scheduling Pipelined Multiprocessor Tasks.
International Conference on Computational Science (1) 2001: 61-70 |
| 5 |  | W. K. Yeung,
Ceyda Oguz,
T. C. Edwin Cheng:
Minimizing Weighted Number of Early and Tardy Jobs with a Common Due Window Involving Location Penalty.
Annals OR 108(1-4): 33-54 (2001) |
| 4 |  | W. K. Yeung,
Ceyda Oguz,
T. C. Edwin Cheng:
Single-machine scheduling with a common due window.
Computers & OR 28(2): 157-175 (2001) |
| 1999 |
| 3 |  | Muhammet Fikret Ercan,
Ceyda Oguz,
Yu-Fai Fung:
Job Scheduling in a Multi-layer Vision System.
Euro-Par 1999: 317-321 |
| 1997 |
| 2 |  | Ceyda Oguz,
Bertrand M. T. Lin,
T. C. Edwin Cheng:
Two-stage flowshop scheduling with a common second-stage machine.
Computers & OR 24(12): 1169-1174 (1997) |
| 1994 |
| 1 |  | T. C. Edwin Cheng,
Zhi-Long Chen,
Ceyda Oguz:
One-machine batching and sequencing of multiple-type items.
Computers & OR 21(7): 717-721 (1994) |