 | 2009 |
| 20 |  | Liang-Yuh Ouyang,
Jinn-Tsair Teng,
Suresh Kumar Goyal,
Chih-te Yang:
An economic order quantity model for deteriorating items with partially permissible delay in payments linked to order quantity.
European Journal of Operational Research 194(2): 418-431 (2009) |
| 2008 |
| 19 |  | Chia-Huei Ho,
Liang-Yuh Ouyang,
Chia-Hsien Su:
Optimal pricing, shipment and payment policy for an integrated supplier-buyer inventory model with two-part trade credit.
European Journal of Operational Research 187(2): 496-510 (2008) |
| 18 |  | Tsu-Pang Hsieh,
Chung-Yuan Dye,
Liang-Yuh Ouyang:
Determining optimal lot size for a two-warehouse system with deterioration and shortages using net present value.
European Journal of Operational Research 191(1): 182-192 (2008) |
| 2007 |
| 17 |  | Liang-Yuh Ouyang,
Kun-Shan Wu,
Chih-te Yang:
An EOQ Model with Limited Storage Capacity under Trade Credits.
APJOR 24(4): 575-592 (2007) |
| 16 |  | Chia-Hsien Su,
Liang-Yuh Ouyang,
Chia-Huei Ho,
Chun-Tao Chang:
Retailer's inventory Policy and supplier's Delivery Policy under Two-Level Trade Credit Strategy.
APJOR 24(5): 613-630 (2007) |
| 15 |  | Chung-Yuan Dye,
Liang-Yuh Ouyang,
Tsu-Pang Hsieh:
Deterministic inventory model for deteriorating items with capacity constraint and time-proportional backlogging rate.
European Journal of Operational Research 178(3): 789-807 (2007) |
| 14 |  | Chung-Yuan Dye,
Tsu-Pang Hsieh,
Liang-Yuh Ouyang:
Determining optimal selling price and lot size with a varying rate of deterioration and exponential partial backlogging.
European Journal of Operational Research 181(2): 668-678 (2007) |
| 13 |  | Kun-Shan Wu,
Liang-Yuh Ouyang,
Chia-Huei Ho:
Integrated vendor--buyer inventory system with sublot sampling inspection policy and controllable lead time.
Int. J. Systems Science 38(4): 339-350 (2007) |
| 2006 |
| 12 |  | Liang-Yuh Ouyang,
Kun-Shan Wu,
Chia-Huei Ho:
The Single-Vendor Single-Buyer Integrated inventory Problem with Quality Improvement and lead Time Reduction - minimax Distribution-Free Approach.
APJOR 23(3): 407-424 (2006) |
| 11 |  | Liang-Ho Chen,
Liang-Yuh Ouyang:
Fuzzy inventory model for deteriorating items with permissible delay in payment.
Applied Mathematics and Computation 182(1): 711-726 (2006) |
| 10 |  | Horng-Jinh Chang,
Jinn-Tsair Teng,
Liang-Yuh Ouyang,
Chung-Yuan Dye:
Retailer's optimal pricing and lot-sizing policies for deteriorating items with partial backlogging.
European Journal of Operational Research 168(1): 51-64 (2006) |
| 9 |  | Hung-Chi Chang,
Jing-Shing Yao,
Liang-Yuh Ouyang:
Fuzzy mixture inventory model involving fuzzy random variable lead time demand and fuzzy total demand.
European Journal of Operational Research 169(1): 65-80 (2006) |
| 8 |  | Hung-Chi Chang,
Liang-Yuh Ouyang,
Kun-Shan Wu,
Chia-Huei Ho:
Integrated vendor-buyer cooperative inventory models with controllable lead time and ordering cost reduction.
European Journal of Operational Research 170(2): 481-495 (2006) |
| 2005 |
| 7 |  | Chung-Yuan Dye,
Liang-Yuh Ouyang:
An EOQ model for perishable items under stock-dependent selling rate and time-dependent partial backlogging.
European Journal of Operational Research 163(3): 776-783 (2005) |
| 2004 |
| 6 |  | Bor-Ren Chuang,
Liang-Yuh Ouyang,
Kai-Wayne Chuang:
A note on periodic review inventory model with controllable setup cost and lead time.
Computers & OR 31(4): 549-561 (2004) |
| 2003 |
| 5 |  | Jing-Shing Yao,
Liang-Yuh Ouyang,
Hung-Chi Chang:
Models for a fuzzy inventory of two replaceable merchandises without backorder based on the signed distance of fuzzy sets.
European Journal of Operational Research 150(3): 601-616 (2003) |
| 2002 |
| 4 |  | Liang-Yuh Ouyang,
Cheng-Kang Chen,
Hung-Chi Chang:
Quality improvement, setup cost and lead-time reductions in lot size reorder point models with an imperfect production process.
Computers & OR 29(12): 1701-1717 (2002) |
| 3 |  | Liang-Yuh Ouyang,
Jing-Shing Yao:
A minimax distribution free procedure for mixed inventory model involving variable lead time with fuzzy demand.
Computers & OR 29(5): 471-487 (2002) |
| 2000 |
| 2 |  | Liang-Yuh Ouyang,
Bor-Ren Chuang:
A periodic review inventory model involving variable lead time with a service level constraint.
Int. J. System Science 31(10): 1209-1215 (2000) |
| 1997 |
| 1 |  | Liang-Yuh Ouyang,
Kun-Shan Wu:
Mixture inventory model involving variable lead time with a service level constraint.
Computers & OR 24(9): 875-882 (1997) |