 | 2008 |
| 9 |  | Yunpeng Pan,
Jun Wang:
Nonlinear model predictive control using a recurrent neural network.
IJCNN 2008: 2296-2301 |
| 8 |  | Yunpeng Pan,
Jun Wang:
Robust Model Predictive Control Using a Discrete-Time Recurrent Neural Network.
ISNN (1) 2008: 883-892 |
| 7 |  | Yunpeng Pan,
Leyuan Shi:
New Hybrid Optimization Algorithms for Machine Scheduling Problems.
IEEE T. Automation Science and Engineering 5(2): 337-348 (2008) |
| 6 |  | Hoksung Yau,
Yunpeng Pan,
Leyuan Shi:
New Solution Approaches to the General Single- Machine Earliness-Tardiness Problem.
IEEE T. Automation Science and Engineering 5(2): 349-360 (2008) |
| 5 |  | Liang Pi,
Yunpeng Pan,
Leyuan Shi:
Hybrid Nested Partitions and Mathematical Programming Approach and Its Applications.
IEEE T. Automation Science and Engineering 5(4): 573-586 (2008) |
| 2007 |
| 4 |  | Yunpeng Pan,
Leyuan Shi:
On the equivalence of the max-min transportation lower bound and the time-indexed lower bound for single-machine scheduling problems.
Math. Program. 110(3): 543-559 (2007) |
| 2006 |
| 3 |  | Yunpeng Pan,
Leyuan Shi:
Branch-and-bound algorithms for solving hard instances of the one-machine sequencing problem.
European Journal of Operational Research 168(3): 1030-1039 (2006) |
| 2004 |
| 2 |  | Yunpeng Pan,
Leyuan Shi:
A Stochastic On-Line Model for Shipment Date Quoting with On-Time Delivery Guarantees.
Winter Simulation Conference 2004: 1195-1200 |
| 2003 |
| 1 |  | Yunpeng Pan:
An improved branch and bound algorithm for single machine scheduling with deadlines to minimize total weighted completion time.
Oper. Res. Lett. 31(3): 492-496 (2003) |