 | 2003 |
| 5 |  | Eckhard Freund,
Dirk H. Pensky:
Distributing 3D manufacturing simulations to realize the digital plant.
ICRA 2003: 1705-1710 |
| 4 |  | Eckhard Freund,
Dirk H. Pensky:
Hierarchically Distributed Processing and Coupling of Manufacturing Simulations and Production Control.
PDPTA 2003: 596-601 |
| 2002 |
| 3 |  | Eckhard Freund,
Dirk H. Pensky:
COSIMIR Factory: Extending the use of Manufacturing Simulations.
ICRA 2002: 2805-2810 |
| 2001 |
| 2 |  | Eckhard Freund,
Alfred Hypki,
Dirk H. Pensky:
New Architecture for Corporate Integration of Simulation and Production Control in Industrial Applications.
ICRA 2001: 806-811 |
| 1995 |
| 1 |  | Eckhard Freund,
F. Dierks,
Dirk H. Pensky,
D. Rokossa:
Realisierung eines Mobilen Roboters für Kommissionieraufgaben.
AMS 1995: 20-29 |