| 2008 | ||
|---|---|---|
| 8 | Erica L. Plambeck: Asymptotically Optimal Control for an Assemble-to-Order System with Capacitated Component Production and Fixed Transport Costs. Operations Research 56(5): 1158-1171 (2008) | |
| 7 | Erica L. Plambeck, Amy R. Ward: Optimal control of a high-volume assemble-to-order system with maximum leadtime quotation and expediting. Queueing Syst. 60(1-2): 1-69 (2008) | |
| 2007 | ||
| 6 | Erica L. Plambeck, Amy R. Ward: Note: A Separation Principle for a Class of Assemble-to-Order Systems with Expediting. Operations Research 55(3): 603-609 (2007) | |
| 2006 | ||
| 5 | Erica L. Plambeck, Amy R. Ward: Optimal Control of a High-Volume Assemble-to-Order System. Math. Oper. Res. 31(3): 453-477 (2006) | |
| 2004 | ||
| 4 | Erica L. Plambeck: Optimal Leadtime Differentiation via Diffusion Approximations. Operations Research 52(2): 213-228 (2004) | |
| 2003 | ||
| 3 | Erica L. Plambeck, Stefanos A. Zenios: Incentive Efficient Control of a Make-to-Stock Production System. Operations Research 51(3): 371-386 (2003) | |
| 2001 | ||
| 2 | Erica L. Plambeck, Sunil Kumar, J. Michael Harrison: A Multiclass Queue in Heavy Traffic with Throughput Time Constraints: Asymptotically Optimal Dynamic Controls. Queueing Syst. 39(1): 23-54 (2001) | |
| 1996 | ||
| 1 | Erica L. Plambeck, Bor-Ruey Fu, Stephen M. Robinson, Rajan Suri: Sample-path optimization of convex stochastic performance functions. Math. Program. 75: 137-176 (1996) | |
| 1 | Bor-Ruey Fu | [1] |
| 2 | J. Michael Harrison | [2] |
| 3 | Sunil Kumar | [2] |
| 4 | Stephen M. Robinson | [1] |
| 5 | Rajan Suri | [1] |
| 6 | Amy R. Ward | [5] [6] [7] |
| 7 | Stefanos A. Zenios | [3] |