 | 2009 |
| 11 |  | A. Awasthi,
Satyaveer Singh Chauhan,
Michel Parent,
Y. Lechevallier,
Jean-Marie Proth:
A Data Mining Approach for Adaptive Path Planning on Large Road Networks.
Foundations of Computational (6) 2009: 297-320 |
| 10 |  | Cyril Duron,
Mohamed Aly Ould Louly,
Jean-Marie Proth:
The one machine scheduling problem: Insertion of a job under the real-time constraint.
European Journal of Operational Research 199(3): 695-701 (2009) |
| 9 |  | Gerd Finke,
Pierre Lemaire,
Jean-Marie Proth,
Maurice Queyranne:
Minimizing the number of machines for minimum length schedules.
European Journal of Operational Research 199(3): 702-705 (2009) |
| 2008 |
| 8 |  | Alexandre Dolgui,
Nikolai Guschinsky,
Genrikh Levin,
Jean-Marie Proth:
Optimisation of multi-position machines and transfer lines.
European Journal of Operational Research 185(3): 1375-1389 (2008) |
| 2007 |
| 7 |  | Jean-Marie Proth:
Scheduling: New trends in industrial environment.
Annual Reviews in Control 31(1): 157-166 (2007) |
| 6 |  | Satyaveer Singh Chauhan,
Valery Gordon,
Jean-Marie Proth:
Scheduling in supply chain environment.
European Journal of Operational Research 183(3): 961-970 (2007) |
| 2005 |
| 5 |  | Cyril Duron,
Jean-Marie Proth,
Yorai Wardi:
Insertion of a random task in a schedule: a real-time approach.
European Journal of Operational Research 164(1): 52-63 (2005) |
| 2004 |
| 4 |  | Cyril Duron,
Jean-Marie Proth:
Insertion of a random bitask in a schedule: a real-time approach.
Computers & OR 31(5): 779-790 (2004) |
| 2003 |
| 3 |  | Satyaveer Singh Chauhan,
Jean-Marie Proth:
The concave cost supply problem.
European Journal of Operational Research 148(2): 374-383 (2003) |
| 2002 |
| 2 |  | Cyril Duron,
Jean-Marie Proth:
Multifunction Radar: Task Scheduling.
J. Math. Model. Algorithms 1(2): 105-116 (2002) |
| 1995 |
| 1 |  | Haoxun Chen,
Chengbin Chu,
Jean-Marie Proth:
A More Efficient lagrangian Relaxation Approach to Job-Shop Scheduling Problems.
ICRA 1995: 496-501 |