 | 2008 |
| 9 |  | Alireza Rahimi-Vahed,
Ali Hossein Mirzaei:
Solving a bi-criteria permutation flow-shop problem using shuffled frog-leaping algorithm.
Soft Comput. 12(5): 435-452 (2008) |
| 2007 |
| 8 |  | Alireza Rahimi-Vahed,
Masoud Rabbani,
Reza Tavakkoli-Moghaddam,
S. Ali Torabi,
Fariborz Jolai:
A multi-objective scatter search for a mixed-model assembly line sequencing problem.
Advanced Engineering Informatics 21(1): 85-99 (2007) |
| 7 |  | Reza Tavakkoli-Moghaddam,
Alireza Rahimi-Vahed,
Ali Hossein Mirzaei:
A hybrid multi-objective immune algorithm for a flow shop scheduling problem with bi-objectives: Weighted mean completion time and weighted mean tardiness.
Inf. Sci. 177(22): 5072-5090 (2007) |
| 6 |  | Alireza Rahimi-Vahed,
S. M. Mirghorbani:
A multi-objective particle swarm for a flow shop scheduling problem.
J. Comb. Optim. 13(1): 79-102 (2007) |
| 5 |  | Alireza Rahimi-Vahed,
S. M. Mirghorbani,
Masoud Rabbani:
A new particle swarm algorithm for a multi-objective mixed-model assembly line sequencing problem.
Soft Comput. 11(10): 997-1012 (2007) |
| 2006 |
| 4 |  | Alireza Rahimi-Vahed,
Masoud Rabbani,
Reza Tavakkoli-Moghaddam,
Fariborz Jolai,
Neda Manavizadeh:
Mixed-Model Assembly Line Sequencing Using Real Options.
OR 2006: 161-167 |
| 3 |  | Masoud Rabbani,
Alireza Rahimi-Vahed,
Babak Javadi,
Reza Tavakkoli-Moghaddam:
A New Approach for Mixed-Model Assembly Line Sequencing.
OR 2006: 169-174 |
| 2 |  | S. M. Mirghorbani,
Masoud Rabbani,
Reza Tavakkoli-Moghaddam,
Alireza Rahimi-Vahed:
A Multi-Objective Particle Swarm for a Mixed-Model Assembly Line Sequencing.
OR 2006: 181-186 |
| 1 |  | Reza Tavakkoli-Moghaddam,
Alireza Rahimi-Vahed:
Multi-criteria sequencing problem for a mixed-model assembly line in a JIT production system.
Applied Mathematics and Computation 181(2): 1471-1481 (2006) |