| 2009 | ||
|---|---|---|
| 2 | Racem Mellouli, Cherif Sadfi, Chengbin Chu, Imed Kacem: Identical parallel-machine scheduling under availability constraints to minimize the sum of completion times. European Journal of Operational Research 197(3): 1150-1165 (2009) | |
| 2005 | ||
| 1 | Cherif Sadfi, Bernard Penz, Christophe Rapine, Jacek Blazewicz, Piotr Formanowicz: An improved approximation algorithm for the single machine total completion time scheduling problem with availability constraints. European Journal of Operational Research 161(1): 3-10 (2005) | |
| 1 | Jacek Blazewicz | [1] |
| 2 | Chengbin Chu | [2] |
| 3 | Piotr Formanowicz | [1] |
| 4 | Imed Kacem | [2] |
| 5 | Racem Mellouli | [2] |
| 6 | Bernard Penz | [1] |
| 7 | Christophe Rapine | [1] |