| 2007 | ||
|---|---|---|
| 3 | Tadeusz Sawik: A lexicographic approach to bi-objective scheduling of single-period orders in make-to-order manufacturing. European Journal of Operational Research 180(3): 1060-1075 (2007) | |
| 2004 | ||
| 2 | Tadeusz Sawik: Loading and scheduling of a flexible assembly system by mixed integer programming. European Journal of Operational Research 154(1): 1-19 (2004) | |
| 2002 | ||
| 1 | Tadeusz Sawik: Monolithic vs. hierarchical balancing and scheduling of a flexible assembly line. European Journal of Operational Research 143(1): 115-124 (2002) | |