 | 2009 |
| 19 |  | Jörg Keller,
Wolfram Schiffmann:
Guiding performance tuning for grid schedules.
IPDPS 2009: 1-6 |
| 2008 |
| 18 |  | Bernhard Fechner,
Udo Hönig,
Jörg Keller,
Wolfram Schiffmann:
Fault-tolerant static scheduling for grids.
IPDPS 2008: 1-6 |
| 2007 |
| 17 |  | Morris Riedel,
Thomas Eickermann,
Wolfgang Frings,
Sonja Dominiczak,
Daniel Mallmann,
Thomas Düssel,
Achim Streit,
Paul Gibbon,
Felix Wolf,
Wolfram Schiffmann,
Thomas Lippert:
Design and evaluation of a collaborative online visualization and steering framework implementation for computational grids.
GRID 2007: 169-176 |
| 16 |  | Morris Riedel,
Thomas Eickermann,
Sonja Habbinga,
Wolfgang Frings,
Paul Gibbon,
Daniel Mallmann,
Felix Wolf,
Achim Streit,
Thomas Lippert,
Wolfram Schiffmann,
Andreas Ernst,
Rainer Spurzem,
Wolfgang E. Nagel:
Computational Steering and Online Visualization of Scientific Applications on Large-Scale HPC Systems within e-Science Infrastructures.
eScience 2007: 483-490 |
| 2006 |
| 15 |  | Anthony Sulistio,
Wolfram Schiffmann,
Rajkumar Buyya:
Advanced Reservation-Based Scheduling of Task Graphs on Clusters.
HiPC 2006: 60-71 |
| 14 |  | Udo Hönig,
Wolfram Schiffmann:
Improving the Efficiency of Functional Parallelism by Means of Hyper-Scheduling.
ICPP Workshops 2006: 283-290 |
| 13 |  | Helmut Bähring,
Jörg Keller,
Wolfram Schiffmann:
Remote operation and control of computer engineering laboratory experiments.
WCAE 2006: 6 |
| 2005 |
| 12 |  | Markus T. Wenzel,
Wolfram Schiffmann:
Head Pose Estimation of Partially Occluded Faces.
CRV 2005: 353-360 |
| 11 |  | Markus Bank,
Udo Hönig,
Wolfram Schiffmann:
An ACO-Based Approach for Scheduling Task Graphs with Communication Costs.
ICPP 2005: 623-629 |
| 2004 |
| 10 |  | Udo Hönig,
Wolfram Schiffmann:
Fast Optimal Task Graph Scheduling by Means of an Optimized Parallel A*-Algorithm.
PDPTA 2004: 842-848 |
| 9 |  | Udo Hönig,
Jörg Keller,
Wolfram Schiffmann:
Internet-basierter Übungsbetrieb in Technischer Informatik (Web-Based Exercises in Computer Engineering).
it - Information Technology 46(5): 255-264 (2004) |
| 2003 |
| 8 |  | Udo Hönig,
Wolfram Schiffmann:
A Parallel Branch-and-Bound Algorithm for Computing Optimal Task Graph Schedules.
GCC (2) 2003: 18-25 |
| 2001 |
| 7 |  | Jörg Fricke,
Wolfram Schiffmann:
Telematiklabor für Digitalschaltungen.
GI Jahrestagung (2) 2001: 1149-1153 |
| 2000 |
| 6 |  | Wolfram Schiffmann:
Encoding feedforward networks for topology optimization by simulated evolution.
KES 2000: 361-364 |
| 1998 |
| 5 |  | Merten Joost,
Wolfram Schiffmann:
Speeding Up Backpropagation Algorithms by Using Cross-Entropy Combined with Pattern Normalization.
International Journal of Uncertainty, Fuzziness and Knowledge-Based Systems 6(2): 117-126 (1998) |
| 1993 |
| 4 |  | Wolfram Schiffmann:
Evolutionäres Design von neurnalen Netzen.
Informatik in den Biowissenschaften 1993: 121-132 |
| 3 |  | Wolfram Schiffmann,
H. Willi Geffers:
Adaptive control of dynamic systems by back propagation networks.
Neural Networks 6(4): 517-524 (1993) |
| 1991 |
| 2 |  | Wolfram Schiffmann:
Adaptive Regelung eines linearen zeitinvarianten Systems dritter Ordnung mit Totzeit durch ein neuronales Netzwerk.
Physik und Informatik 1991: 28-34 |
| 1990 |
| 1 |  | Wolfram Schiffmann,
Merten Joost,
Randolf Werner:
Performance Evaluation of Evolutionarily Created Neural Network Topologies.
PPSN 1990: 274-283 |