 | 2009 |
| 9 |  | Anthony Caumond,
Philippe Lacomme,
A. Moukrim,
Nikolay Tchernev:
An MILP for scheduling problems in an FMS with one vehicle.
European Journal of Operational Research 199(3): 706-722 (2009) |
| 8 |  | James A. Rappold,
Nikolay Tchernev:
Special Issue on Supply Chain Design.
European Journal of Operational Research 199(3): 732-733 (2009) |
| 2008 |
| 7 |  | Anthony Caumond,
Philippe Lacomme,
Nikolay Tchernev:
A memetic algorithm for the job-shop with time-lags.
Computers & OR 35(7): 2331-2356 (2008) |
| 2006 |
| 6 |  | Michelle Chabrol,
Pierre Féniès,
Michel Gourgand,
Nikolay Tchernev:
Un environnement de modélisation pour le système d'information de la Supply Chain. Application au Nouvel Hôpital Estaing.
Ingénierie des Systèmes d'Information 11(1): 137-162 (2006) |
| 5 |  | Abdelhakim Artiba,
Nikolay Tchernev:
Editorial.
Int. J. Computer Integrated Manufacturing 19(3): 195-196 (2006) |
| 2005 |
| 4 |  | Michelle Chabrol,
Pierre Féniès,
Michel Gourgand,
Nikolay Tchernev:
Un environnement de modélisation pour le système d'information de la Supply Chain: application au Nouvel Hôpital d'Estaing.
INFORSID 2005: 603-618 |
| 2000 |
| 3 |  | Michelle Chabrol,
David Sarramia,
Nikolay Tchernev:
Object oriented methodology for urban traffic modelling and simulation.
ESM 2000: 246-250 |
| 2 |  | Michel Gourgand,
Alain Tanguy,
Nikolay Tchernev:
A generic hybrid flow-shop simulation model using SIMULA.
ESM 2000: 307-312 |
| 1 |  | Michel Gourgand,
Philippe Lacomme,
Nikolay Tchernev:
Simulation based scheduling with WIP consideration for FMS using trip-based material handling systems.
ESM 2000: 481-488 |