| 2009 | ||
|---|---|---|
| 21 | Sukgon Kim, Reha Uzsoy: Heuristics for capacity planning problems with congestion. Computers & OR 36(6): 1924-1934 (2009) | |
| 20 | Karthik Sourirajan, Leyla Ozsen, Reha Uzsoy: A genetic algorithm for a single product network design model with lead time and safety stock considerations. European Journal of Operational Research 197(2): 599-608 (2009) | |
| 2008 | ||
| 19 | Chen-Fu Chien, Stéphane Dauzère-Pérès, Hans Ehm, John W. Fowler, Zhibin Jiang, Shekar Krishnaswamy, Lars Mönch, Reha Uzsoy: Modeling and analysis of semiconductor manufacturing in a shrinking world: Challenges and successes. Winter Simulation Conference 2008: 2093-2099 | |
| 18 | Durmus Fatih Irdem, Necip Baris Kacar, Reha Uzsoy: An experimental study of an iterative simulation-optimization algorithm for production planning. Winter Simulation Conference 2008: 2176-2184 | |
| 17 | Abhijit Upasani, Reha Uzsoy: Incorporating manufacturing lead times in joint production-marketing models: A review and some future directions. Annals OR 161(1): 171-188 (2008) | |
| 16 | Reha Uzsoy, Juan Diego Velásquez: Heuristics for minimizing maximum lateness on a single machine with family-dependent set-up times. Computers & OR 35(6): 2018-2033 (2008) | |
| 2007 | ||
| 15 | Seza Orcun, Sila Çetinkaya, Reha Uzsoy: Determining safety stocks in the presence of workload-dependent lead times. Winter Simulation Conference 2007: 1691-1698 | |
| 14 | Sujay Malve, Reha Uzsoy: A genetic algorithm for minimizing maximum lateness on parallel identical batch processing machines with dynamic job arrivals and incompatible job families. Computers & OR 34(10): 3016-3028 (2007) | |
| 13 | Vishal A. Varma, Reha Uzsoy, Joseph F. Pekny, Gary Blau: Lagrangian heuristics for scheduling new product development projects in the pharmaceutical industry. J. Heuristics 13(5): 403-433 (2007) | |
| 12 | Karthik Sourirajan, Reha Uzsoy: Hybrid decomposition heuristics for solving large-scale scheduling problems in semiconductor wafer fabrication. J. Scheduling 10(1): 41-65 (2007) | |
| 2006 | ||
| 11 | Seza Orcun, Reha Uzsoy, Karl G. Kempf: Using system dynamics simulations to compare capacity models for production planning. Winter Simulation Conference 2006: 1855-1862 | |
| 10 | Christopher Geiger, Reha Uzsoy, Haldun Aytug: Rapid Modeling and Discovery of Priority Dispatching Rules: An Autonomous Learning Approach. J. Scheduling 9(1): 7-34 (2006) | |
| 2005 | ||
| 9 | Haldun Aytug, Mark A. Lawley, Kenneth McKay, Shantha Mohan, Reha Uzsoy: Executing production schedules in the face of uncertainties: A review and some future directions. European Journal of Operational Research 161(1): 86-110 (2005) | |
| 8 | Erdem Eskigun, Reha Uzsoy, Paul V. Preckel, George Beaujon, Subramanian Krishnan, Jeffrey D. Tew: Outbound supply chain network design with mode selection, lead times and capacitated vehicle distribution centers. European Journal of Operational Research 165(1): 182-206 (2005) | |
| 2002 | ||
| 7 | Cheng-Shuo Wang, Reha Uzsoy: A genetic algorithm to minimize maximum lateness on a batch processing machine. Computers & OR 29(12): 1621-1640 (2002) | |
| 2001 | ||
| 6 | Ronald L. Rardin, Reha Uzsoy: Experimental Evaluation of Heuristic Optimization Algorithms: A Tutorial. J. Heuristics 7(3): 261-304 (2001) | |
| 2000 | ||
| 5 | Elif Akçali, Reha Uzsoy, David G. Hiscock, Anne L. Moser, Timothy J. Teyner: Alternative loading and dispatching policies for furnace operations in semiconductor manufacturing: a comparison by simulation. Winter Simulation Conference 2000: 1428-1435 | |
| 4 | Irfan M. Ovacik, Srikanth Rajagopalan, Reha Uzsoy: Integrating Interval Estimates of Global Optima and Local Search Methods for Combinatorial Optimization Problems. J. Heuristics 6(4): 481-500 (2000) | |
| 1999 | ||
| 3 | Miae Woo, Reha Uzsoy, Arif Ghafoor: Media Streams Scheduling for Synchronization in Distributed Multimedia Systems. J. Parallel Distrib. Comput. 56(3): 272-295 (1999) | |
| 1997 | ||
| 2 | Ebru Demirkol, Sanjay Mehta, Reha Uzsoy: A Computational Study of Shifting Bottleneck Procedures for Shop Scheduling Problems. J. Heuristics 3(2): 111-137 (1997) | |
| 1996 | ||
| 1 | Suresh Chand, Rodney Traub, Reha Uzsoy: An iterative heuristic for the single machine dynamic total completion time scheduling problem. Computers & OR 23(7): 641-651 (1996) | |