 | 2009 |
| 7 |  | Dehua Xu,
Zhenmin Cheng,
Yunqiang Yin,
Hongxing Li:
Makespan minimization for two parallel machines scheduling with a periodic availability constraint.
Computers & OR 36(6): 1809-1812 (2009) |
| 6 |  | Dehua Xu,
Yunqiang Yin,
Hongxing Li:
A note on "scheduling of nonresumable jobs and flexible maintenance activities on a single machine to minimize makespan".
European Journal of Operational Research 197(2): 825-827 (2009) |
| 5 |  | Fei Li,
Yunqiang Yin:
Approaches to knowledge reduction of covering decision systems based on information theory.
Inf. Sci. 179(11): 1694-1704 (2009) |
| 4 |  | Yunqiang Yin,
Dehua Xu,
Kaibiao Sun,
Hongxing Li:
Some scheduling problems with general position-dependent and time-dependent learning effects.
Inf. Sci. 179(14): 2416-2425 (2009) |
| 2008 |
| 3 |  | Yunqiang Yin,
Hongxing Li:
The characterizations of h.
Inf. Sci. 178(17): 3451-3464 (2008) |
| 2007 |
| 2 |  | Fei Li,
Yunqiang Yin,
Lingxia Lu:
(delta, T)-fuzzy rough approximation operators and the TL-fuzzy rough ideals on a ring.
Inf. Sci. 177(21): 4711-4726 (2007) |
| 1 |  | Yunqiang Yin,
Hongxing Li:
Note on "Generalized fuzzy interior ideals in semigroups".
Inf. Sci. 177(24): 5798-5800 (2007) |