| 2007 | ||
|---|---|---|
| 4 | EE | Yingchun Yuan, Xiaoping Li, Qian Wang, Xia Zhu: Cost Optimization Method for Workflows with Deadline Constraints in Grids. CSCWD 2007: 783-788 |
| 3 | EE | Yingchun Yuan, Xiansong Li, Chenxia Sun: Cost-effective Heuristics for Workflow Scheduling in Grid Computing Economy. GCC 2007: 322-329 |
| 2006 | ||
| 2 | EE | Yingchun Yuan, Xiaoping Li, Qian Wang: Time-Cost Tradeoff Dynamic Scheduling Algorithm for Workflows in Grids. CSCWD 2006: 872-877 |
| 1 | EE | Yingchun Yuan, Xiaoping Li, Qian Wang: Dynamic Heuristics for Time and Cost Reduction in Grid Workflows. CSCWD (Selected Papers) 2006: 499-508 |
| 1 | Xiansong Li | [3] |
| 2 | Xiaoping Li | [1] [2] [4] |
| 3 | Chenxia Sun | [3] |
| 4 | Qian Wang | [1] [2] [4] |
| 5 | Xia Zhu | [4] |