 | 2010 |
| 9 |  | V. Roshanaei,
M. M. Seyyed Esfehani,
M. Zandieh:
Integrating non-preemptive open shops scheduling with sequence-dependent setup times using advanced metaheuristics.
Expert Syst. Appl. 37(1): 259-266 (2010) |
| 8 |  | M. A. Adibi,
M. Zandieh,
M. Amiri:
Multi-objective scheduling of dynamic job shop using variable neighborhood search.
Expert Syst. Appl. 37(1): 282-287 (2010) |
| 7 |  | M. Amiri,
M. Zandieh,
B. Vahdani,
R. Soltani,
V. Roshanaei:
An integrated eigenvector-DEA-TOPSIS methodology for portfolio risk evaluation in the FOREX spot market.
Expert Syst. Appl. 37(1): 509-516 (2010) |
| 6 |  | M. Yazdani,
M. Amiri,
M. Zandieh:
Flexible job-shop scheduling with parallel variable neighborhood search algorithm.
Expert Syst. Appl. 37(1): 678-687 (2010) |
| 2009 |
| 5 |  | M. Amiri,
M. Zandieh,
R. Soltani,
B. Vahdani:
A hybrid multi-criteria decision-making model for firms competence evaluation.
Expert Syst. Appl. 36(10): 12314-12322 (2009) |
| 4 |  | B. Naderi,
M. Zandieh,
A. Khaleghi Ghoshe Balagh,
V. Roshanaei:
An improved simulated annealing for hybrid flowshops with sequence-dependent setup and transportation times to minimize total completion time and total tardiness.
Expert Syst. Appl. 36(6): 9625-9633 (2009) |
| 3 |  | J. Behnamian,
M. Zandieh,
S. M. T. Fatemi Ghomi:
Parallel-machine scheduling problems with sequence-dependent setup times using an ACO, SA and VNS hybrid algorithm.
Expert Syst. Appl. 36(6): 9637-9644 (2009) |
| 2 |  | J. Behnamian,
S. M. T. Fatemi Ghomi,
M. Zandieh:
A multi-phase covering Pareto-optimal front method to multi-objective scheduling in a realistic hybrid flowshop using a hybrid metaheuristic.
Expert Syst. Appl. 36(8): 11057-11069 (2009) |
| 2006 |
| 1 |  | M. Zandieh,
S. M. T. Fatemi Ghomi,
S. M. Moattar Husseini:
An immune algorithm approach to hybrid flow shops scheduling with sequence-dependent setup times.
Applied Mathematics and Computation 180(1): 111-127 (2006) |