Volume 60, Number 1, February 2011
Regular papers
- Jian Mao, Shiqing Liu, Zhu Gao:
Three-axis NC milling simulation based on adaptive triangular mesh.
1-6

- Shu-Hsing Chung, Tai-Hsi Wu, Chin-Chih Chang:
An efficient tabu search algorithm to the cell formation problem with alternative routings and machine reliability considerations.
7-15

- Jason Chao-Hsien Pan, Damon H. E. Tai:
A new strategy for defect inspection by the virtual inspection in semiconductor wafer fabrication.
16-24

- Vladimir Kogan, Todd Rind:
Determining critical power equipment inventory using extreme value approach and an auxiliary Poisson model.
25-33

- Yixiang Yue, Leishan Zhou, Qunxing Yue, Zhenping Fan:
Multi-route railroad blocking problem by improved model and ant colony algorithm in real world.
34-42

- Chantal Baril, Soumaya Yacout, Bernard Clément:
Design for Six Sigma through collaborative multiobjective optimization.
43-55

- Xiuli Qu, Ronald L. Rardin, Julie Ann S. Williams:
Single versus hybrid time horizons for open access scheduling.
56-65

- José M. Merigó, Montserrat Casanovas:
Decision-making with distance measures and induced aggregation operators.
66-76

- Shichang Du, Lifeng Xi:
Fault diagnosis in assembly processes based on engineering-driven rules and PSOSAEN algorithm.
77-88

- Y. Samimi, A. Aghaie:
Using logistic regression formulation to monitor heterogeneous usage rate for subscription-based services.
89-98

- Jalal Ashayeri, N. Ma, Renata Sotirov:
An aggregated optimization model for multi-head SMD placements.
99-105

- José M. Merigó, Montserrat Casanovas:
Induced and uncertain heavy OWA operators.
106-116

- Chia-Huei Ho:
The optimal integrated inventory policy with price-and-credit-linked demand under two-level trade credit.
117-126

- Chung-Yuan Dye, Liang-Yuh Ouyang:
A particle swarm optimization for solving joint pricing and lot-sizing problem with fluctuating demand and trade credit financing.
127-137

- Juyoung Wy, Sangwon Jeong, Byung-In Kim, Junhyuk Park, Jaejoon Shin, Hyunjoong Yoon, Sujeong Lee:
A data-driven generic simulation model for logistics-embedded assembly manufacturing lines.
138-147

- Zhanguo Zhu, Linyan Sun, Feng Chu, Ming Liu:
Single-machine group scheduling with resource allocation and learning effect.
148-157

- Taeho Park, Hyuck Moo Kwon, Sung-Hoon Hong, Min Koo Lee:
The optimum common process mean and screening limits for a production process with multiple products.
158-163

- Saoussen Krichen, Awatef Laabidi, Fouad Ben Abdelaziz:
Single supplier multiple cooperative retailers inventory model with quantity discount and permissible delay in payments.
164-172

- Christoph H. Glock:
A multiple-vendor single-buyer integrated inventory model with a variable number of vendors.
173-182

Short communication
Volume 60, Number 2, March 2011
Regular papers
- César Rego, Frank Mathew:
A filter-and-fan algorithm for the capacitated minimum spanning tree problem.
187-194

- Ahmad Alzghoul, Magnus Löfstrand:
Increasing availability of industrial systems through data stream mining.
195-205

- Nils Boysen, Malte Fliedner:
Scheduling aircraft landings to balance workload of ground staff.
206-217

- Yiyong Xiao, Ikou Kaku, Qiuhong Zhao, Ren-qian Zhang:
A variable neighborhood search based approach for uncapacitated multilevel lot-sizing problems.
218-227

- Keun Lee, Sohyung Cho, Shihab Asfour:
Web-based algorithm for cylindricity evaluation using support vector machine learning.
228-235

- Adel A. Alamri:
Theory and methodology on the global optimal solution to a General Reverse Logistics Inventory Model for deteriorating items and time-varying rates.
236-247

- Sangmun Shin, Funda Samanlioglu, Byung Rae Cho, Margaret M. Wiecek:
Computing trade-offs in robust design: Perspectives of the mean squared error.
248-255

- Yanlai Li, Min Huang, Kwai-Sang Chin, Xinggang Luo, Yi Han:
Integrating preference analysis and balanced scorecard to product planning house of quality.
256-268

- Chuen-Sheng Cheng, Hui-Ping Cheng:
Using neural networks to detect the bivariate process variance shifts pattern.
269-278

- Sai S. Nudurupati, Umit S. Bititci, Vikas Kumar, Felix T. S. Chan:
State of the art literature review on performance measurement.
279-290

- Jianxiang Li, Feng Chu, Haoxun Chen:
Coordination of split deliveries in one-warehouse multi-retailer distribution systems.
291-301

- Junxiu Jia, Qiying Hu:
Dynamic ordering and pricing for a perishable goods supply chain.
302-309

- Nilgun Fescioglu-Unver, Mieczyslaw M. Kokar:
Self Controlling Tabu Search algorithm for the Quadratic Assignment Problem.
310-319

- Abir Ben Hmida, Mohamed Haouari, Marie-José Huguet, Pierre Lopez:
Solving two-stage hybrid flow shop using climbing depth-bounded discrepancy search.
320-327

- Ali Azadeh, Morteza Saberi, Mona Anvari:
An Integrated Artificial Neural Network Fuzzy C-Means-Normalization Algorithm for performance assessment of decision-making units: The cases of auto industry and power plant.
328-340

- Shaojun Li, Fei Li:
Alopex-based evolutionary algorithm and its application to reaction kinetic parameter estimation.
341-348

- Taha Ghasemi, Mohammadreza Razzazi:
Development of core to solve the multidimensional multiple-choice knapsack problem.
349-360

- El Houssaine Aghezzaf, Carles Sitompul, Frank Van den Broecke:
A robust hierarchical production planning for a capacitated two-stage production system.
361-372

Volume 60, Number 3, April 2011
- Qiuhong Zhao, Guoping Xia:
Foreword.
375

- Burcin Cakir, Fulya Altiparmak, Berna Dengiz:
Multi-objective optimization of a stochastic assembly line balancing: A hybrid simulated annealing algorithm.
376-384

- Gülgün Alpan, Rim Larbi, Bernard Penz:
A bounded dynamic programming approach to schedule operations in a cross docking platform.
385-396

- Li-Ting Huang, I.-Chien Hsieh, Cheng-Kiang Farn:
On ordering adjustment policy under rolling forecast in supply chain planning.
397-410

- Jing Wang, Jun Zhao, Xun Wang:
Optimum policy in hybrid manufacturing/remanufacturing system.
411-419

- Navid Sahebjamnia, Mohammad Mahdi Paydar:
Applying fuzzy approach to develop transient probability matrix for on-line variable quality monitoring.
420-425

- Li-Man Liao, Ching-Jen Huang:
Tabu search heuristic for two-machine flowshop with batch processing machines.
426-432

- Yuanyang Gao, Zemin Niu, Xiaoya Wang:
Analysis on the effects of stock sharing on supply chain.
433-437

- Ruey Huei Yeh, Hui-Chiung Lo, Rouh-Yun Yu:
A study of maintenance policies for second-hand products.
438-444

- G. Z. Jia, M. Bai:
An approach for manufacturing strategy development based on fuzzy-QFD.
445-454

- Sebastián Lozano, Gabriel Villa, David Canca:
Application of centralised DEA approach to capital budgeting in Spanish ports.
455-465

- Masako Omachi, Shinichiro Omachi, Hirotomo Aso, Tsuneo Saito:
Pattern recognition using boundary data of component distributions.
466-472

Volume 60, Number 4, May 2011
Survey
Regular papers
- H. Y. Zhang, M. Xie, T. N. Goh, M. Shamsuzzaman:
Economic design of time-between-events control chart system.
485-492

- Debashree Guha, Debjani Chakraborty:
Fuzzy multi attribute group decision making method to achieve consensus under the consideration of degrees of confidence of experts' opinions.
493-504

- Hesuan Hu, Zhiwu Li, Abdulrahman Al-Ahmari:
Reversed fuzzy Petri nets and their application for fault diagnosis.
505-510

- Huaqing Wang, Peng Chen:
Intelligent diagnosis method for rolling element bearing faults using possibility theory and neural network.
511-518

- Glaydston Mattos Ribeiro, Geraldo R. Mauri, Luiz Antonio Nogueira Lorena:
A simple and robust Simulated Annealing algorithm for scheduling workover rigs on onshore oil fields.
519-526

- Kim Fung Lam, Feng Bai:
Minimizing deviations of input and output weights from their means in data envelopment analysis.
527-533

- T. C. Edwin Cheng, Shuenn-Ren Cheng, Wen-Hung Wu, Peng-Hsiang Hsu, Chin-Chia Wu:
A two-agent single-machine scheduling problem with truncated sum-of-processing-times-based learning considerations.
534-541

- Feifeng Zheng, Yinfeng Xu, Chung Keung Poon, E. Zhang, Xiaoping Wu:
Online deadline scheduling with preemption penalties.
542-549

- A. A. Foroughi:
A new mixed integer linear model for selecting the best decision making units in data envelopment analysis.
550-554

- Glenn W. Kuriger, F. Hank Grant:
A Lexicographic Nelder-Mead simulation optimization method to solve multi-criteria problems.
555-565

- Jiahai Wang, Yiqiao Cai, Yalan Zhou, Rong Long Wang, Caiwei Li:
Discrete particle swarm optimization based on estimation of distribution for terminal assignment problems.
566-575

- Yuan-Shyi Peter Chiu, Hong-Dar Lin, Huei-Hsin Chang:
Mathematical modeling for solving manufacturing run time problem with defective rate and random machine breakdown.
576-584

- Mehdi Soltanifar, Farhad Hosseinzadeh Lotfi:
The voting analytic hierarchy process method for discriminating among efficient decision making units in data envelopment analysis.
585-592

- I.-Lin Wang, Yi-Chang James Tsai, Feng Li:
A network flow model for clustering segments and minimizing total maintenance and rehabilitation cost.
593-601

- T. C. Edwin Cheng, Chou-Jung Hsu, Dar-Li Yang:
Unrelated parallel-machine scheduling with deteriorating maintenance activities.
602-605

- Victor Hugo Barros, Tarcísio Souza Costa, Alexandre C. M. Oliveira, Luiz Antonio Nogueira Lorena:
Model and heuristic for berth allocation in tidal bulk ports with stock level constraints.
606-613

- Ying-Chin Ho, Ta-Wei Liao:
A concurrent solution for intra-cell flow path layouts and I/O point locations of cells in a cellular manufacturing system.
614-634

- José Machado, Eurico Seabra, José Creissac Campos, Filomena O. Soares, Celina P. Leão:
Safe controllers design for industrial automation systems.
635-653

- Kamran S. Moghaddam, John S. Usher:
Preventive maintenance and replacement scheduling for repairable and maintainable systems using dynamic programming.
654-665

- Jyh-Wen Ho, Yeu-Shiang Huang:
A study on the life of an innovative product using a Bayesian approach.
666-676

- Massimo Pacella, Quirico Semeraro:
Monitoring roundness profiles based on an unsupervised neural network algorithm.
677-689

- F. J. Hwang, Bertrand M. T. Lin:
Coupled-task scheduling on a single machine subject to a fixed-job-sequence.
690-698

- Liang Gao, Guohui Zhang, Liping Zhang, Xinyu Li:
An efficient memetic algorithm for solving the job shop scheduling problem.
699-705

- Yi Zhang, Xiaoping Li:
Estimation of distribution algorithm for permutation flow shops with total flowtime minimization.
706-718

- Tatpong Katanyukul, William S. Duff, Edwin K. P. Chong:
Approximate dynamic programming for an inventory problem: Empirical comparison.
719-743

- Tzong-Ru Tsai, Pang-Hsu Liu, Y. L. Lio:
Optimal maintenance time for imperfect maintenance actions on repairable product.
744-749

- Xue Huang, Ming-Zheng Wang, Ji-Bo Wang:
Single-machine group scheduling with both learning effects and deteriorating jobs.
750-754

- Ji-Bo Wang, Jian-Jun Wang:
Single-machine scheduling jobs with exponential learning functions.
755-759

- Chih-Chieh Yang:
Constructing a hybrid Kansei engineering system based on multiple affective responses: Application to product form design.
760-768

- Taho Yang, Yu-An Shen:
The dynamic transfer batch-size decision for thin film transistor-liquid crystal display array manufacturing by artificial neural-network.
769-776

- Sangmun Shin, Nguyen Khoa Viet Truong, Byung Rae Cho, Sung Hoon Hong:
Development of a sequential robust-tolerance design model for a destructive quality characteristic.
777-789

- Chin-Chia Wu, Yunqiang Yin, Shuenn-Ren Cheng:
Some single-machine scheduling problems with a truncation learning effect.
790-795

- Chou-Jung Hsu, Suh-Jenq Yang, Dar-Li Yang:
Two due date assignment problems with position-dependent processing time on a single-machine.
796-800

- Susana Ferreiro, Basilio Sierra, Itziar Irigoien, Eneko Gorritxategi:
Data mining for quality control: Burr detection in the drilling process.
801-810

- Hakim Akeb, Mhand Hifi, Mohamed Elhafedh Ould Ahmed Mounir:
Local branching-based algorithms for the disjunctively constrained knapsack problem.
811-820

- Zheng Sifa, Cao Jiandong, Lian Xiaomin, Li Keqiang:
Urban pickup and delivery problem considering time-dependent fuzzy velocity.
821-829

- Ozcan Kilincci:
Firing sequences backward algorithm for simple assembly line balancing problem of type 1.
830-839

- Xiao-Yuan Wang, Ming-Zheng Wang, Ji-Bo Wang:
Flow shop scheduling to minimize makespan with decreasing time-dependent job processing times.
840-844

- Yuan-Ping Luh:
An innovative framework of collaborative-based workflow in Development Chain Management.
845-862

- G. B. Zhang, Y. Ran, X. L. Ren:
Study on product quality tracing technology in supply chain.
863-871

Erratum
Last update Sat May 25 19:44:23 2013
CET by the DBLP Team —
Data released under the ODC-BY 1.0 license — See also our legal information page