Volume 28,
Number 1,
January 2000
Volume 28,
Number 2,
February 2001
Volume 28,
Number 3,
March 2001
Volume 28,
Number 4,
April 2001
- Alex Van Breedam:
Comparing descent heuristics and metaheuristics for the vehicle routing problem.
289-315
- Micha Mandel, Gur Mosheiov:
Minimizing maximum earliness on parallel identical machines.
317-327
- Shine-Der Lee:
On solving unreliable planar location problems.
329-344
- Kun-Nyeong Chang, Dongwoo Kim:
Optimal prioritized channel allocation in cellular mobile systems.
345-356
- B. P. M. Duarte:
The expected utility theory applied to an industrial decision problem - what technological alternative to implement to treat industrial solid residuals.
357-380
- G. Peter Zhang, B. Eddy Patuwo, Michael Y. Hu:
A simulation study of artificial neural networks for nonlinear time-series forecasting.
381-396
Volume 28,
Number 5,
April 2001
- Yun Seong Eum, Kyung Sam Park, Soung Hie Kim:
Establishing dominance and potential optimality in multi-criteria analysis with imprecise weight and value.
397-409
- Cem Canel, Basheer M. Khumawala, Japhett Law, Anthony Loh:
An algorithm for the capacitated, multi-commodity multi-period facility location problem.
411-427
- Oded Berman, K. P. Sapna:
Optimal control of service for facilities holding inventory.
429-441
- I. M. Premachandra:
An approximation of the activity duration distribution in PERT.
443-452
- S. Kalpakam, S. Shanthi:
A perishable inventory system with modified (S-1, S) policy and arbitrary processing times.
453-471
- Mani K. Agrawal, Salah E. Elmaghraby:
On computing the distribution function of the sum of independent random variables.
473-483
- Jae Kyeong Kim, Sang Hyun Choi:
A utility range-based interactive group support system for multiattribute decision making.
485-503
Volume 28,
Number 6,
May 2001
Volume 28,
Number 7,
June 2001
Volume 28,
Number 8,
July 2001
Volume 28,
Number 9,
August 2001
- In Lee:
Artificial intelligence search methods for multi-machine two-stage scheduling with due date penalty, inventory, and machining costs.
835-852
- M. I. Vidalis, H. T. Papadopoulos:
A recursive algorithm for generating the transition matrices of multistation multiserver exponential reliable queueing networks.
853-883
- Veronique Inghelbrecht, Bart Steyaert, Herwig Bruneel, Sabine Wittevrongel:
Buffer contents and cell delay in a rate adaptation buffer with Markovian arrivals.
885-898
- N. C. Simpson:
Questioning the relative virtues of dynamic lot sizing rules.
899-914
- Kun-Jen Chung, Sui-Fu Tsai:
Inventory systems for deteriorating items with shortages and a linear trend in demand-taking account of time value.
915-934
Volume 28,
Number 10,
September 2001
Volume 28,
Number 11,
September 2001
- Hanif D. Sherali, Burak Özdaryal, Warren P. Adams, Naguib Attia:
On using exterior penalty approaches for solving linear programming problems.
1049-1074
- Jacques A. Ferland, Soumia Ichoua, Alain Lavoie, Éric Gagné:
Scheduling using tabu search methods with intensification and diversification.
1075-1092
- Chih-Hsiung Wang, Shey-Huei Sheu:
Simultaneous determination of the optimal production-inventory and product inspection policies for a deteriorating production system.
1093-1110
- Jason Chao-Hsien Pan, Jen-Shiang Chen, Hung-Liang Cheng:
A heuristic approach for single-machine scheduling with due dates and class setups.
1111-1130
- (the paper was retracted)
- K. F. Lam, H. W. Mui, H. K. Yuen:
A note on minimizing absolute percentage error in combined forecasts.
1141-1147
Volume 28,
Number 12,
October 2001
- Roman Novak, Joze Rugelj, Gorazd Kandus:
A note on distributed multicast routing in point-to-point networks.
1149-1164
- Jamal Ouenniche, Fayez F. Boctor:
The multi-product, economic lot-sizing problem in flow shops: the powers-of-two heuristic.
1165-1182
- Guoqiang Peter Zhang:
An investigation of neural networks for linear time-series forecasting.
1183-1202
- S. Kar, A. K. Bhunia, M. Maiti:
Inventory of multi-deteriorating items sold from two shops under single management with constraints on space and investment.
1203-1221
- Umar Al-Turki, C. Fedjki, Abdulbasit Andijani:
Tabu search for a class of single-machine scheduling problems.
1223-1230
- Raymond L. Major, Cliff T. Ragsdale:
Aggregating expert predictions in a networked environment.
1231-1244
- Han-Lin Li, Jung-Fa Tsai:
A fast algorithm for assortment optimization problems.
1245-1252
Volume 28,
Number 13,
November 2001
- Ingo Hofacker, Rudolf Vetschera:
Algorithmical approaches to business process design.
1253-1275
- Yi-Kuei Lin:
A simple algorithm for reliability evaluation of a stochastic-flow network with node failure.
1277-1285
- Rafael Martí, Vicente Estruch:
Incremental bipartite drawing problem.
1287-1298
- Dieter Fiems, Bart Steyaert, Herwig Bruneel:
Performance evaluation of CAI and RAI transmission modes in a GI-G-1 queue.
1299-1313
- S. Kar, A. K. Bhunia, M. Maiti:
Deterministic inventory model with two levels of storage, a linear trend in demand and a fixed time horizon.
1315-1331
- Stan Lipovetsky, W. Michael Conklin:
Multiobjective regression modifications for collinearity.
1333-1345
- Hong Suk Choi, Heesoo Lee, Ki-Dong Lee, Sehun Kim, Jong Hyup Lee:
Optimal locations of switches and interconnections for ATM LANs.
1347-1366
Volume 28,
Number 14,
December 2001
- Young H. Chun:
Optimal partitioning of groups in selecting the best choice.
1367-1386
- M. Reza Zamani:
A high-performance exact method for the resource-constrained project scheduling problem.
1387-1401
- Adil Baykasoglu, Nabil N. Z. Gindy:
A simulated annealing algorithm for dynamic layout problem.
1403-1426
- Eiji Takeda:
A method for multiple pseudo-criteria decision problems.
1427-1439
- Ming-Jong Yao:
The peak load minimization problem in cyclic production.
1441-1460
Copyright © Tue Nov 24 20:45:26 2009
by Michael Ley (ley@uni-trier.de)