| j27 | Harun Aydilek, Ali Allahverdi: Heuristics for no-wait flowshops with makespan subject to mean completion time. Applied Mathematics and Computation 219(1): 351-359 (2012) | |
| j26 | Talel Ladhari, Mohamed Kais Msakni, Ali Allahverdi: Minimizing the total completion time in a two-machine flowshop with sequence-independent setup times. JORS 63(4): 445-459 (2012) | |
| 2010 | ||
| j25 | Harun Aydilek, Ali Allahverdi: Two-machine flowshop scheduling problem with bounded processing times to minimize total completion time. Computers & Mathematics with Applications 59(2): 684-693 (2010) | |
| j24 | Ali Allahverdi, Harun Aydilek: Heuristics for the two-machine flowshop scheduling problem to minimize maximum lateness with bounded processing times. Computers & Mathematics with Applications 60(5): 1374-1384 (2010) | |
| j23 | Fawaz S. Al-Anzi, Khaled Al-Zame, Ali Allahverdi: Weighted Multi-Skill Resources Project Scheduling. JSEA 3(12): 1125-1130 (2010) | |
| 2009 | ||
| j22 | Rubén Ruiz, Ali Allahverdi: Minimizing the bicriteria of makespan and maximum tardiness with an upper bound on maximum tardiness. Computers & OR 36(4): 1268-1283 (2009) | |
| j21 | Fawaz S. Al-Anzi, Ali Allahverdi: Heuristics for a two-stage assembly flowshop with bicriteria of maximum lateness and makespan. Computers & OR 36(9): 2682-2689 (2009) | |
| j20 | Ali Allahverdi, Fawaz S. Al-Anzi: The two-stage assembly scheduling problem to minimize total completion time with setup times. Computers & OR 36(10): 2740-2747 (2009) | |
| 2008 | ||
| j19 | Ali Allahverdi, H. M. Soroush: The significance of reducing setup times/setup costs. European Journal of Operational Research 187(3): 978-984 (2008) | |
| j18 | Ali Allahverdi, C. T. Ng, T. C. Edwin Cheng, Mikhail Y. Kovalyov: A survey of scheduling problems with setup times or costs. European Journal of Operational Research 187(3): 985-1032 (2008) | |
| 2007 | ||
| j17 | Rubén Ruiz, Ali Allahverdi: Some effective heuristics for no-wait flowshops with setup times to minimize total completion time. Annals OR 156(1): 143-171 (2007) | |
| j16 | Fawaz S. Al-Anzi, Ali Allahverdi: A self-adaptive differential evolution heuristic for two-stage assembly scheduling problem to minimize maximum lateness with setup times. European Journal of Operational Research 182(1): 80-94 (2007) | |
| j15 | Fawaz S. Al-Anzi, Ali Allahverdi, Mikhail Y. Kovalyov: Batching deteriorating items with applications in computer communication and reverse logistics. European Journal of Operational Research 182(3): 1002-1011 (2007) | |
| 2006 | ||
| j14 | Fawaz S. Al-Anzi, Yuri N. Sotskov, Ali Allahverdi, George V. Andreev: Using mixed graph coloring to minimize total completion time in job shop scheduling. Applied Mathematics and Computation 182(2): 1137-1148 (2006) | |
| j13 | Ali Allahverdi, Fawaz S. Al-Anzi: A PSO and a Tabu search heuristics for the assembly scheduling problem of the two-stage distributed database application. Computers & OR 33: 1056-1080 (2006) | |
| j12 | Ali Allahverdi, Fawaz S. Al-Anzi: A branch-and-bound algorithm for three-machine flowshop scheduling problem to minimize total completion time with separate setup times. European Journal of Operational Research 169(3): 767-780 (2006) | |
| 2005 | ||
| j11 | Fawaz S. Al-Anzi, Ali Allahverdi: Using a Hybrid Evolutionary Algorithm to Minimize Variance in Response Time for Multimedia Object Requests. J. Math. Model. Algorithms 4(4): 435-453 (2005) | |
| 2004 | ||
| j10 | Ali Allahverdi: A new heuristic for m-machine flowshop scheduling problem with bicriteria of makespan and maximum tardiness. Computers & OR 31(2): 157-180 (2004) | |
| j9 | Ali Allahverdi, Tariq A. Aldowaisan: No-wait flowshops with bicriteria of makespan and maximum lateness. European Journal of Operational Research 152(1): 132-147 (2004) | |
| 2003 | ||
| j8 | Tariq A. Aldowaisan, Ali Allahverdi: New heuristics for no-wait flowshops to minimize makespan. Computers & OR 30(8): 1219-1231 (2003) | |
| j7 | Ali Allahverdi: The two- and m-machine flowshop scheduling problems with bicriteria of makespan and mean flowtime. European Journal of Operational Research 147(2): 373-396 (2003) | |
| c1 | Ali Allahverdi, Fawaz S. Al-Anzi: Scheduling Requests on Multi-Stage Multi-Server to Increase Quality of Service. Net-Con 2003: 14-25 | |
| 2002 | ||
| j6 | Ali Allahverdi, Fawaz S. Al-Anzi: Using two-machine flowshop with maximum lateness objective to model multimedia data objects scheduling problem for WWW applications. Computers & OR 29(8): 971-994 (2002) | |
| 2000 | ||
| j5 | Ali Allahverdi: Minimizing mean flowtime in a two-machine flowshop with sequence-independent setup times. Computers & OR 27(2): 111-127 (2000) | |
| 1999 | ||
| j4 | Ali Allahverdi: Stochastically minimizing total flowtime in flowshops with no waiting space. European Journal of Operational Research 113(1): 101-112 (1999) | |
| 1998 | ||
| j3 | Tariq A. Aldowaisan, Ali Allahverdi: Total flowtime in no-wait flowshops with separated setup times. Computers & OR 25(9): 757-765 (1998) | |
| 1997 | ||
| j2 | Ali Allahverdi: Scheduling in stochastic flowshops with independent setup, processing and removal times. Computers & OR 24(10): 955-960 (1997) | |
| 1996 | ||
| j1 | Ali Allahverdi: Two-machine proportionate flowshop scheduling with breakdowns to minimize maximum lateness. Computers & OR 23(10): 909-916 (1996) | |