Please note: This is a beta version of the new dblp website.
You can find the classic dblp view of this page here.
You can find the classic dblp view of this page here.
Christian Artigues
2010 – today
- 2013
[j28]Maria Ayala, Abir Benabid, Christian Artigues, Claire Hanen: The resource-constrained modulo scheduling problem: an experimental study. Comp. Opt. and Appl. 54(3): 645-673 (2013)
[j27]Christian Artigues, Peter Brucker, Sigrid Knust, Oumar Koné, Pierre Lopez, Marcel Mongeau: A note on "event-based MILP models for resource-constrained project scheduling problems". Computers & OR 40(4): 1060-1063 (2013)
[j26]Thierry Garaix, Christian Artigues, Cyril Briand: Fast minimum float computation in activity networks under interval uncertainty. J. Scheduling 16(1): 93-103 (2013)- 2012
[c7]Gilles Simonin, Christian Artigues, Emmanuel Hebrard, Pierre Lopez: Scheduling Scientific Experiments on the Rosetta/Philae Mission. CP 2012: 23-37
[c6]Kata Kiatmanaroj, Christian Artigues, Laurent Houssin, Frédéric Messine: Frequency allocation in a SDMA satellite communication system with beam moving. ICC 2012: 3265-3269- 2011
[j25]Laurent Houssin, Christian Artigues, Erwan Corbel: Frequency allocation problem in a SDMA satellite communication system. Computers & Industrial Engineering 61(2): 346-351 (2011)
[j24]Alain Haït, Christian Artigues: On electrical load tracking scheduling for a steel plant. Computers & Chemical Engineering 35(12): 3044-3047 (2011)
[j23]Oumar Koné, Christian Artigues, Pierre Lopez, Marcel Mongeau: Event-based MILP models for resource-constrained project scheduling problems. Computers & OR 38(1): 3-13 (2011)
[j22]Thierry Garaix, Christian Artigues, Dominique Feillet, Didier Josselin: Optimization of occupancy rate in dial-a-ride problems via linear fractional column generation. Computers & OR 38(10): 1435-1442 (2011)
[j21]Christian Artigues, Marie-José Huguet, Pierre Lopez: Generalized disjunctive constraint propagation for solving the job shop problem with time lags. Eng. Appl. of AI 24(2): 220-231 (2011)
[c5]Roel Leus, Christian Artigues, Fabrice Talla Nobibon: Robust optimization for resource-constrained project scheduling with uncertain activity durations. IEEM 2011: 101-105- 2010
[j20]Mohamed Ali Aloulou, Christian Artigues: Flexible solutions in disjunctive scheduling: General formulation and study of the flow-shop case. Computers & OR 37(5): 890-898 (2010)
[j19]Boris Bontoux, Christian Artigues, Dominique Feillet: A Memetic Algorithm with a large neighborhood crossover operator for the Generalized Traveling Salesman Problem. Computers & OR 37(11): 1844-1852 (2010)
[j18]Bernat Gacias, Christian Artigues, Pierre Lopez: Parallel machine scheduling with precedence constraints and setup times. Computers & OR 37(12): 2141-2151 (2010)
[j17]Maria Ayala, Christian Artigues, Bernat Gacias: Lagrangian relaxation-based lower bound for resource-constrained modulo scheduling. Electronic Notes in Discrete Mathematics 36: 191-198 (2010)
[j16]Christian Artigues, Nicolas Jozefowiez, Mohamed Ali Aloulou: An exact method for the bi-objective one-machine problem with maximum lateness and unit family setup cost objectives. Electronic Notes in Discrete Mathematics 36: 1233-1240 (2010)
[j15]Thierry Garaix, Christian Artigues, Dominique Feillet, Didier Josselin: Vehicle routing problems with alternative paths: An application to on-demand transportation. European Journal of Operational Research 204(1): 62-75 (2010)
[j14]Rafael Elizondo, Víctor Parada, Lorena Pradenas, Christian Artigues: An evolutionary and constructive approach to a crew scheduling problem in underground passenger transport. J. Heuristics 16(4): 575-591 (2010)
[c4]Sébastien Lannez, Christian Artigues, Jean Damay, Michel Gendreau: Column Generation Heuristic for a Rich Arc Routing Problem. ATMOS 2010: 130-141
2000 – 2009
- 2009
[j13]Christian Artigues, Michel Gendreau, Louis-Martin Rousseau, Adrien Vergnaud: Solving an integrated employee timetabling and job-shop scheduling problem via hybrid branch-and-bound. Computers & OR 36(8): 2330-2340 (2009)
[j12]Audrey Dupont, Andréa Carneiro Linhares, Christian Artigues, Dominique Feillet, Philippe Michelon, Michel Vasquez: The dynamic frequency assignment problem. European Journal of Operational Research 195(1): 75-88 (2009)
[j11]Christian Artigues, Van-Dat Cung, Gerd Finke, Bernard Penz: Articles ROADEF 2007. RAIRO - Operations Research 43(4): 373-374 (2009)
[j10]Christian Artigues, Cyril Briand: The resource-constrained activity insertion problem with minimum and maximum time lags. J. Scheduling 12(5): 447-460 (2009)
[i2]Bernat Gacias, Christian Artigues, Pierre Lopez: Parallel machine scheduling with precedence constraints and setup times. CoRR abs/0902.3121 (2009)- 2008
[j9]Christian Artigues, Dominique Feillet: A branch and bound method for the job-shop problem with sequence-dependent setup times. Annals OR 159(1): 135-159 (2008)
[j8]Christine Solnon, Van-Dat Cung, Alain Nguyen, Christian Artigues: The car sequencing problem: Overview of state-of-the-art methods and industrial case-study of the ROADEF'2005 challenge problem. European Journal of Operational Research 191(3): 912-927 (2008)- 2007
[c3]Mohamed Ali Aloulou, Christian Artigues: Worst-Case Evaluation of Flexible Solutions in Disjunctive Scheduling Problems. ICCSA (3) 2007: 1027-1036- 2006
[j7]Christian Artigues, Dominique Feillet, Philippe Michelon: Editorial. RAIRO - Operations Research 40(2): 75-76 (2006)
[c2]Christian Artigues, Michel Gendreau, Louis-Martin Rousseau: A Flexible Model and a Hybrid Exact Method for Integrated Employee Timetabling and Production Scheduling. PATAT 2006: 67-84
[i1]Christian Artigues, Pierre Lopez, Pierre-Dimitri Ayache: Schedule generation schemes for the job-shop problem with sequence-dependent setup times: dominance properties and computational analysis. CoRR abs/cs/0606043 (2006)- 2005
[j6]Christian Artigues, Pierre Lopez, Pierre-Dimitri Ayache: Schedule Generation Schemes for the Job-Shop Problem with Sequence-Dependent Setup Times: Dominance Properties and Computational Analysis. Annals OR 138(1): 21-52 (2005)
[j5]Christian Artigues, Jean-Charles Billaut, Carl Esswein: Maximization of solution flexibility for robust shop scheduling. European Journal of Operational Research 165(2): 314-328 (2005)
[j4]Sophie Demassey, Christian Artigues, Philippe Michelon: Constraint-Propagation-Based Cutting Planes: An Application to the Resource-Constrained Project Scheduling Problem. INFORMS Journal on Computing 17(1): 52-65 (2005)- 2004
[j3]Mireille Palpant, Christian Artigues, Philippe Michelon: LSSPER: Solving the Resource-Constrained Project Scheduling Problem with Large Neighbourhood Search. Annals OR 131(1-4): 237-257 (2004)
[c1]Christian Artigues, Sana Belmokhtar, Dominique Feillet: A New Exact Solution Algorithm for the Job Shop Problem with Sequence-Dependent Setup Times. CPAIOR 2004: 37-49- 2003
[j2]Christian Artigues, Philippe Michelon, Stéphane Reusser: Insertion techniques for static and dynamic resource-constrained project scheduling. European Journal of Operational Research 149(2): 249-267 (2003)- 2000
[j1]Christian Artigues, François Roubellat: A polynomial activity insertion algorithm in a multi-resource schedule with cumulative constraints and multiple modes. European Journal of Operational Research 127(2): 297-316 (2000)
Coauthor Index
data released under the ODC-BY 1.0 license. See also our legal information page
last updated on 2013-04-22 21:56 CEST by the dblp team