| 2013 | ||
|---|---|---|
| j16 | Yuan-Shyi Peter Chiu, Hong-Dar Lin: An innovative blemish detection system for curved LED lenses. Expert Syst. Appl. 40(2): 471-479 (2013) | |
| j15 | Singa Wang Chiu, Chien-Hua Lee, Yuan-Shyi Peter Chiu, Feng-Tsung Cheng: Intra-supply chain system with multiple sales locations and quality assurance. Expert Syst. Appl. 40(7): 2669-2676 (2013) | |
| 2012 | ||
| j14 | Singa Wang Chiu, Kuang-Ku Chen, Yuan-Shyi Peter Chiu, Chia-Kuan Ting: Notes on the mathematical modeling approach used to determine the replenishment policy for the EMQ model with rework and multiple shipments. Appl. Math. Lett. 25(11): 1964-1968 (2012) | |
| j13 | Yuan-Shyi Peter Chiu, Kuang-Ku Chen, Chia-Kuan Ting: Replenishment run time problem with machine breakdown and failure in rework. Expert Syst. Appl. 39(1): 1291-1297 (2012) | |
| j12 | Singa Wang Chiu, Yuan-Shyi Peter Chiu, Jyh-Chau Yang: Combining an alternative multi-delivery policy into economic production lot size problem with partial rework. Expert Syst. Appl. 39(3): 2578-2583 (2012) | |
| j11 | Hong-Dar Lin, Yuan-Shyi Peter Chiu: Note on "replenishment run time problem with machine breakdown and failure in rework". Expert Syst. Appl. 39(17): 13070-13072 (2012) | |
| 2011 | ||
| j10 | Yuan-Shyi Peter Chiu, Hong-Dar Lin, Ming-Hon Hwang, Nong Pan: Computational Optimization of Manufacturing Batch Size and Shipment for an Integrated EPQ Model with Scrap. American J. Computational Mathematics 1(3): 202-207 (2011) | |
| j9 | Yuan-Shyi Peter Chiu, Hong-Dar Lin, Huei-Hsin Chang: Mathematical modeling for solving manufacturing run time problem with defective rate and random machine breakdown. Computers & Industrial Engineering 60(4): 576-584 (2011) | |
| j8 | Yuan-Shyi Peter Chiu, Shang-Chih Liu, Chun-Lin Chiu, Huei-Hsin Chang: Mathematical modeling for determining the replenishment policy for EMQ model with rework and multiple shipments. Mathematical and Computer Modelling 54(9-10): 2165-2174 (2011) | |
| 2010 | ||
| j7 | Yuan-Shyi Peter Chiu, Feng-Tsung Cheng, Huei-Hsin Chang: Remarks on the optimization process of a manufacturing system with stochastic breakdown and rework. Appl. Math. Lett. 23(10): 1152-1155 (2010) | |
| j6 | Yuan-Shyi Peter Chiu, Kuang-Ku Chen, Feng-Tsung Cheng, Mei-Fang Wu: Optimization of the finite production rate model with scrap, rework and stochastic machine breakdown. Computers & Mathematics with Applications 59(2): 919-932 (2010) | |
| j5 | Yuan-Shyi Peter Chiu, Chia-Kuan Ting: A note on "Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns". European Journal of Operational Research 201(2): 641-643 (2010) | |
| 2009 | ||
| j4 | Yuan-Shyi Peter Chiu, Hong-Dar Lin: A hybrid approach based on Hotelling statistics for automated visual inspection of display blemishes in LCD panels. Expert Syst. Appl. 36(10): 12332-12339 (2009) | |
| c1 | Hong-Dar Lin, Yuan-Shyi Peter Chiu, Wan-Ting Lin: Automated Industrial Inspection of Light-emitting Diodes Using Computer Vision. IPCV 2009: 59-65 | |
| 2008 | ||
| j3 | Hong-Dar Lin, Yuan-Shyi Peter Chiu, Chia-Kuan Ting: A note on optimal replenishment policy for imperfect quality EMQ model with rework and backlogging. Computers & Mathematics with Applications 56(11): 2819-2824 (2008) | |
| 2007 | ||
| j2 | Singa Wang Chiu, Shan-Ling Wang, Yuan-Shyi Peter Chiu: Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns. European Journal of Operational Research 180(2): 664-676 (2007) | |
| j1 | Singa Wang Chiu, Chia-Kuan Ting, Yuan-Shyi Peter Chiu: Optimal production lot sizing with rework, scrap rate, and service level constraint. Mathematical and Computer Modelling 46(3-4): 535-549 (2007) | |
Data released under the ODC-BY 1.0 license — See also our legal information page