| 2013 | ||
|---|---|---|
| j7 | Z. X. Guo, W. K. Wong, S. Y. S. Leung: A hybrid intelligent model for order allocation planning in make-to-order manufacturing. Appl. Soft Comput. 13(3): 1376-1390 (2013) | |
| j6 | Z. X. Guo, W. K. Wong, Zhi Li, Peiyu Ren: Modeling and Pareto optimization of multi-objective order scheduling problems in production planning. Computers & Industrial Engineering 64(4): 972-986 (2013) | |
| 2012 | ||
| j5 | Wai Keung Wong, S. Y. S. Leung, Z. X. Guo: Feedback controlled particle swarm optimization and its application in time-series prediction. Expert Syst. Appl. 39(10): 8557-8572 (2012) | |
| j4 | Z. X. Guo, Wai Keung Wong, M. Li: Sparsely connected neural network-based time series forecasting. Inf. Sci. 193: 54-71 (2012) | |
| 2010 | ||
| i1 | ||
| 2009 | ||
| j3 | Z. X. Guo, Wai Keung Wong, S. Y. S. Leung, J. T. Fan: Intelligent production control decision support system for flexible assembly lines. Expert Syst. Appl. 36(3): 4268-4277 (2009) | |
| 2008 | ||
| j2 | Z. X. Guo, Wai Keung Wong, S. Y. S. Leung, J. T. Fan, S. F. Chan: Genetic optimization of order scheduling with multiple uncertainties. Expert Syst. Appl. 35(4): 1788-1801 (2008) | |
| j1 | Z. X. Guo, Wai Keung Wong, S. Y. S. Leung, J. T. Fan, S. F. Chan: A Genetic-Algorithm-Based Optimization Model for Solving the Flexible Assembly Line Balancing Problem With Work Sharing and Workstation Revisiting. IEEE Transactions on Systems, Man, and Cybernetics, Part C 38(2): 218-228 (2008) | |
| 2006 | ||
| c1 | Z. X. Guo, Wai Keung Wong, S. Y. S. Leung, J. T. Fan, S. F. Chan: A Bi-level Genetic Algorithm for Multi-objective Scheduling of Multi- and Mixed-Model Apparel Assembly Lines. Australian Conference on Artificial Intelligence 2006: 934-941 | |
| 1 | S. F. Chan | |
| 2 | J. T. Fan | |
| 3 | S. Y. S. Leung | |
| 4 | M. Li | |
| 5 | Zhi Li | |
| 6 | Peiyu Ren | |
| 7 | W. K. Wong | |
| 8 | Wai Keung Wong |
Data released under the ODC-BY 1.0 license — See also our legal information page