| 2010 | ||
|---|---|---|
| j25 | Pitu B. Mirchandani, Jing-Quan Li, Yejuan Long: Locating a Surveillance Infrastructure in and Near Ports or on Other Planar Surfaces to Monitor Flows. Comp.-Aided Civil and Infrastruct. Engineering 25(2): 89-100 (2010) | |
| 2009 | ||
| j24 | Alessandro Agnetis, Enrico Grande, Pitu B. Mirchandani, Andrea Pacifici: Covering a line segment with variable radius discs. Computers & OR 36(5): 1423-1436 (2009) | |
| j23 | Jing-Quan Li, Pitu B. Mirchandani, Denis Borenstein: Real-time vehicle rerouting problems with time windows. European Journal of Operational Research 194(3): 711-727 (2009) | |
| c1 | Enrico Grande, Pitu B. Mirchandani, Andrea Pacifici: Column Generation for the Multicommodity Min-cost Flow Over Time Problem. CTW 2009: 321-324 | |
| 2008 | ||
| j22 | Yi-Chang Chiu, Pitu B. Mirchandani: Online Behavior-Robust Feedback Information Routing Strategy for Mass Evacuation. IEEE Transactions on Intelligent Transportation Systems 9(2): 264-274 (2008) | |
| 2007 | ||
| j21 | Jing-Quan Li, Denis Borenstein, Pitu B. Mirchandani: A decision support system for the single-depot vehicle rescheduling problem. Computers & OR 34(4): 1008-1032 (2007) | |
| j20 | Massimiliano Caramia, Paolo Dell'Olmo, Monica Gentili, Pitu B. Mirchandani: Delivery itineraries and distribution capacity of a freight network with time slots. Computers & OR 34(6): 1585-1600 (2007) | |
| j19 | Jing-Quan Li, Pitu B. Mirchandani, Denis Borenstein: The vehicle rescheduling problem: Model and algorithms. Networks 50(3): 211-229 (2007) | |
| j18 | Pitu B. Mirchandani, Ning Zou: Queuing Models for Analysis of Traffic Adaptive Signal Control. IEEE Transactions on Intelligent Transportation Systems 8(1): 50-59 (2007) | |
| i1 | Alessandro Agnetis, Enrico Grande, Pitu B. Mirchandani, Andrea Pacifici: Covering a line segment with variable radius discs. CoRR abs/0707.2921 (2007) | |
| 2005 | ||
| j17 | Monica Gentili, Pitu B. Mirchandani: Locating Active Sensors on Traffic Networks. Annals OR 136(1): 229-257 (2005) | |
| j16 | Pitu B. Mirchandani, Fei-Yue Wang: RHODES to Intelligent Transportation Systems. IEEE Intelligent Systems 20(1): 10-15 (2005) | |
| 2004 | ||
| j15 | Alessandro Agnetis, Pitu B. Mirchandani, Dario Pacciarelli, Andrea Pacifici: Scheduling Problems with Two Competing Agents. Operations Research 52(2): 229-242 (2004) | |
| 2003 | ||
| j14 | Fei-Yue Wang, Xiaojing Wang, Li Li, Pitu B. Mirchandani: Creating a Digital-Vehicle Proving Ground. IEEE Intelligent Systems 18(2): 12-15 (2003) | |
| j13 | Alejandro Angel, Mark D. Hickman, Pitu B. Mirchandani, Dinesh Chandnani: Methods of analyzing traffic imagery collected from aerial platforms. IEEE Transactions on Intelligent Transportation Systems 4(2): 99-107 (2003) | |
| j12 | Pitu B. Mirchandani: Abstracts for the 2002 Transportation Science Section Dissertation Prize Competition. Transportation Science 37(2): 223-229 (2003) | |
| 2002 | ||
| j11 | Fei-Yue Wang, Zhixue Wang, Pitu B. Mirchandani: The VISTA Project and Its Applications. IEEE Intelligent Systems 17(6): 72-75 (2002) | |
| 2000 | ||
| j10 | Giampiero E. G. Beroggi, Pitu B. Mirchandani: Preface. Computational & Mathematical Organization Theory 6(1): 5-6 (2000) | |
| j9 | Giampiero E. G. Beroggi, Pitu B. Mirchandani: Negotiation and Equilibria in User Competition for Resources: A Dynamic Plot Approach. Computational & Mathematical Organization Theory 6(1): 61-82 (2000) | |
| j8 | Alessandro Agnetis, Pitu B. Mirchandani, Dario Pacciarelli, Andrea Pacifici: Nondominated Schedules for a Job-Shop with Two Competing Users. Computational & Mathematical Organization Theory 6(2): 191-217 (2000) | |
| j7 | Pitu B. Mirchandani, K. Larry Head: Model-based transportation policy analysis. IJTM 19(3/4/5): 507-531 (2000) | |
| j6 | Zuoying Xu, Pitu B. Mirchandani, Susan H. Xu: Virtually fixed channel assignment in cellular mobile networks with recall and handoffs. Telecommunication Systems 13(2-4): 413-439 (2000) | |
| 1992 | ||
| j5 | Susan H. Xu, Srikanta P. R. Kumar, Pitu B. Mirchandani: Scheduling stochastic jobs with increasing hazard rate on identical parallel machines. Computers & OR 19(6): 535-543 (1992) | |
| 1990 | ||
| j4 | Hossein Soroush, Pitu B. Mirchandani: The stochastic multicommodity flow problem. Networks 20(2): 121-155 (1990) | |
| 1985 | ||
| j3 | Pitu B. Mirchandani, Hossein Soroush: Optimal paths in probabilistic networks: A case with temporary preferences. Computers & OR 12(4): 365-381 (1985) | |
| 1980 | ||
| j2 | Pitu B. Mirchandani, Aissa Oudjit: Localizing 2-medians on probabilistic and deterministic tree networks. Networks 10(4): 329-350 (1980) | |
| 1976 | ||
| j1 | Pitu B. Mirchandani: Shortest distance and reliability of probabilistic networks. Computers & OR 3(4): 347-355 (1976) | |
Colors in the list of coauthors
Last update Sun May 26 07:19:23 2013 CET by the DBLP Team —
Data released under the ODC-BY 1.0 license — See also our legal information page