| 2010 | ||
|---|---|---|
| j5 | Boris Detienne, Eric Pinson, David Rivreau: Lagrangian domain reductions for the single machine earliness-tardiness problem with release dates. European Journal of Operational Research 201(1): 45-54 (2010) | |
| j4 | O. Guyon, P. Lemaire, Eric Pinson, David Rivreau: Cut generation for an integrated employee timetabling and production scheduling problem. European Journal of Operational Research 201(2): 557-567 (2010) | |
| 2009 | ||
| j3 | Boris Detienne, Laurent Péridy, Eric Pinson, David Rivreau: Cut generation for an employee timetabling problem. European Journal of Operational Research 197(3): 1178-1184 (2009) | |
| 2005 | ||
| j2 | Laurent Péridy, David Rivreau: Local adjustments: A general algorithm. European Journal of Operational Research 164(1): 24-38 (2005) | |
| 2003 | ||
| j1 | Laurent Péridy, Eric Pinson, David Rivreau: Using short-term memory to minimize the weighted number of late jobs on a single machine. European Journal of Operational Research 148(3): 591-603 (2003) | |
| 1 | Boris Detienne | |
| 2 | O. Guyon | |
| 3 | P. Lemaire | |
| 4 | Eric Pinson | |
| 5 | Laurent Péridy |
Data released under the ODC-BY 1.0 license — See also our legal information page