| 2012 | ||
|---|---|---|
| j43 | Ashutosh Prasad, Suresh P. Sethi, Prasad A. Naik: Understanding the impact of churn in dynamic oligopoly markets. Automatica 48(11): 2882-2887 (2012) | |
| j42 | Ernan Haruvy, Tao Li, Suresh P. Sethi: Two-stage pricing for custom-made products. European Journal of Operational Research 219(2): 405-414 (2012) | |
| j41 | Anshuman Chutani, Suresh P. Sethi: Optimal Advertising and Pricing in a Dynamic Durable Goods Supply Chain. J. Optimization Theory and Applications 154(2): 615-643 (2012) | |
| j40 | Alain Bensoussan, Hongwei Long, Sandun Perera, Suresh P. Sethi: Impulse control with random reaction periods: A central bank intervention problem. Oper. Res. Lett. 40(6): 425-430 (2012) | |
| 2011 | ||
| j39 | Eugene Khmelnitsky, Ernst Presman, Suresh P. Sethi: Optimal production control of a failure-prone machine. Annals OR 182(1): 67-86 (2011) | |
| j38 | Alain Bensoussan, Metin Çakanyildirim, Suresh P. Sethi, Ruixia Shi: Computation of approximate optimal policies in a partially observed inventory model with rain checks. Automatica 47(8): 1589-1604 (2011) | |
| j37 | Alain Bensoussan, Qi Feng, Suresh P. Sethi: Achieving a Long-Term Service Target with Periodic Demand Signals: A Newsvendor Framework. Manufacturing & Service Operations Management 13(1): 73-88 (2011) | |
| j36 | Xiuli He, Anand Krishnamoorthy, Ashutosh Prasad, Suresh P. Sethi: Retail competition and cooperative advertising. Oper. Res. Lett. 39(1): 11-16 (2011) | |
| j35 | Alain Bensoussan, Metin Çakanyildirim, Suresh P. Sethi, Mingzheng Wang, Hanqin Zhang: Average Cost Optimality in Inventory Models With Dynamic Information Delays. IEEE Trans. Automat. Contr. 56(12): 2869-2882 (2011) | |
| 2010 | ||
| j34 | Tamer Basar, Alain Bensoussan, Suresh P. Sethi: Differential games with mixed leadership: The open-loop solution. Applied Mathematics and Computation 217(3): 972-979 (2010) | |
| j33 | Anand Krishnamoorthy, Ashutosh Prasad, Suresh P. Sethi: Optimal pricing and advertising in a durable-good duopoly. European Journal of Operational Research 200(2): 486-497 (2010) | |
| j32 | Xianghua Gan, Suresh P. Sethi, Jing Zhou: Commitment-penalty contracts in drop-shipping supply chains with asymmetric demand information. European Journal of Operational Research 204(3): 449-462 (2010) | |
| j31 | Milind Dawande, Srinagesh Gavirneni, Yinping Mu, Suresh P. Sethi, Chelliah Sriskandarajah: On the Interaction Between Demand Substitution and Production Changeovers. Manufacturing & Service Operations Management 12(4): 682-691 (2010) | |
| j30 | Lakdere Benkherouf, Suresh P. Sethi: Optimality of (s, S) policies for a stochastic inventory model with proportional and lump-sum shortage costs. Oper. Res. Lett. 38(4): 252-255 (2010) | |
| 2009 | ||
| j29 | Ashutosh Prasad, Suresh P. Sethi: Integrated marketing communications in markets with uncertainty and competition. Automatica 45(3): 601-610 (2009) | |
| j28 | Subodha Kumar, Suresh P. Sethi: Dynamic pricing and advertising for web content providers. European Journal of Operational Research 197(3): 924-944 (2009) | |
| j27 | Alain Bensoussan, Metin Çakanyildirim, Suresh P. Sethi: Technical Note - A Note on "The Censored Newsvendor and the Optimal Acquisition of Information". Operations Research 57(3): 791-794 (2009) | |
| j26 | Alain Bensoussan, Anshuman Chutani, Suresh P. Sethi: Optimal cash management under uncertainty. Oper. Res. Lett. 37(6): 425-429 (2009) | |
| j25 | Alain Bensoussan, Metin Çakanyildirim, Andrew Royal, Suresh P. Sethi: Bayesian and adaptive controls for a newsvendor facing exponential demand. Risk and Decision Analysis 1(4): 197-210 (2009) | |
| 2008 | ||
| j24 | Prasad A. Naik, Ashutosh Prasad, Suresh P. Sethi: Building Brand Awareness in Dynamic Oligopoly Markets. Management Science 54(1): 129-138 (2008) | |
| j23 | Alain Bensoussan, Metin Çakanyildirim, J. Adolfo Minjárez-Sosa, Suresh P. Sethi, Ruixia Shi: Partially Observed Inventory Systems: The Case of Rain Checks. SIAM J. Control and Optimization 47(5): 2490-2519 (2008) | |
| 2007 | ||
| j22 | Milind Dawande, Srinagesh Gavirneni, Sanjeewa Naranpanawe, Suresh P. Sethi: Forecast Horizons for a Class of Dynamic Lot-Size Problems Under Discrete Future Demand. Operations Research 55(4): 688-702 (2007) | |
| j21 | Alain Bensoussan, Suresh P. Sethi: The Machine Maintenance and Sale Age Model of Kamien and Schwartz Revisited. Management Science 53(12): 1964-1976 (2007) | |
| j20 | Alain Bensoussan, Metin Çakanyildirim, Suresh P. Sethi: A Multiperiod Newsvendor Problem with Partially Observed Demand. Math. Oper. Res. 32(2): 322-344 (2007) | |
| j19 | Alain Bensoussan, Metin Çakanyildirim, Suresh P. Sethi: Partially Observed Inventory Systems: The Case of Zero-Balance Walk. SIAM J. Control and Optimization 46(1): 176-209 (2007) | |
| j18 | Youhua Chen, Suresh P. Sethi, Hanqin Zhang: A Production-Inventory Problem for an Energy Buy-Back Program. IEEE T. Automation Science and Engineering 4(3): 395-406 (2007) | |
| 2006 | ||
| j17 | Suresh P. Sethi, Qing Zhang: Introduction to the special issue on optimal control applications to management sciences. Automatica 42(8): 1241-1244 (2006) | |
| j16 | Inna G. Drobouchevitch, Suresh P. Sethi, Chelliah Sriskandarajah: Scheduling dual gripper robotic cell: One-unit cycles. European Journal of Operational Research 171(2): 598-631 (2006) | |
| j15 | Qi Feng, Vijay S. Mookerjee, Suresh P. Sethi: Optimal policies for the sizing and timing of software maintenance projects. European Journal of Operational Research 173(3): 1047-1066 (2006) | |
| j14 | Qi Feng, Suresh P. Sethi, Houmin Yan, Hanqin Zhang: Are Base-Stock Policies Optimal in Inventory Problems with Multiple Delivery Modes? Operations Research 54(4): 801-807 (2006) | |
| j13 | Milind Dawande, Srinagesh Gavirneni, Sanjeewa Naranpanawe, Suresh P. Sethi: Computing Minimal Forecast Horizons: An Integer Programming Approach. J. Math. Model. Algorithms 5(2): 239-258 (2006) | |
| 2005 | ||
| j12 | Suresh P. Sethi, Houmin Yan, Hanqin Zhang: Analysis of a Duopoly Supply Chain and its Application in Electricity Spot Markets. Annals OR 135(1): 239-259 (2005) | |
| j11 | Yonghua Ji, Vijay S. Mookerjee, Suresh P. Sethi: Optimal Software Development: A Control Theoretic Approach. Information Systems Research 16(3): 292-306 (2005) | |
| j10 | Milind Dawande, H. Neil Geismar, Suresh P. Sethi, Chelliah Sriskandarajah: Sequencing and Scheduling in Robotic Cells: Recent Developments. J. Scheduling 8(5): 387-426 (2005) | |
| j9 | Alain Bensoussan, R. H. Liu, Suresh P. Sethi: Optimality of an (s, S) Policy with Compound Poisson and Diffusion Demands: A Quasi-variational Inequalities Approach. SIAM J. Control and Optimization 44(5): 1650-1676 (2005) | |
| 2004 | ||
| j8 | Chelliah Sriskandarajah, Inna G. Drobouchevitch, Suresh P. Sethi, Ramaswamy Chandrasekaran: Scheduling Multiple Parts in a Robotic Cell Served by a Dual-Gripper Robot. Operations Research 52(1): 65-82 (2004) | |
| 2003 | ||
| j7 | Suresh P. Sethi, Houmin Yan, Hanqin Zhang: Inventory Models with Fixed Costs, Forecast Updates, and Two Delivery Modes. Operations Research 51(2): 321-328 (2003) | |
| 2001 | ||
| j6 | Suresh P. Sethi, Jeffrey B. Sidney, Chelliah Sriskandarajah: Scheduling in dual gripper robotic cells for productivity gains. IEEE Transactions on Robotics 17(3): 324-341 (2001) | |
| 1999 | ||
| j5 | Jun Yang, Houmin Yan, Suresh P. Sethi: Optimal production planning in pull flow lines with multiple products. European Journal of Operational Research 119(3): 582-604 (1999) | |
| 1998 | ||
| j4 | Suresh P. Sethi, W. Suo, Michael I. Taksar, H. Yan: Optimal Production Planning in a Multi-Product Stochastic Manufacturing System with Long-Run Average Cost. Discrete Event Dynamic Systems 8(1): 37-54 (1998) | |
| j3 | Dirk Beyer, Suresh P. Sethi: A Proof of the Eoq Formula Using Quasi-variational Inequalities. Int. J. Systems Science 29(11): 1295-1299 (1998) | |
| 1997 | ||
| j2 | Ernst Presman, Suresh P. Sethi, W. Suo: Existence of Optimal Feedback Production Plans in Stochastic Flowshops with Limited Buffers. Automatica 33(10): 1899-1903 (1997) | |
| 1995 | ||
| j1 | Ernst Presman, Suresh P. Sethi, Qing Zhang: Optimal feedback production planning in a stochastic N-machine flowshop. Automatica 31(9): 1325-1332 (1995) | |
| 1991 | ||
| c1 | Sheldon X. C. Lou, Houmin Yan, Suresh P. Sethi, Anne Gardel, Prabhat Deosthali: Using simulation to test the robustness of various existing production control policies. Winter Simulation Conference 1991: 261-269 | |
Colors in the list of coauthors
Last update Tue May 21 09:49:01 2013 CET by the DBLP Team —
Data released under the ODC-BY 1.0 license — See also our legal information page