| 2012 | ||
|---|---|---|
| j14 | M. Duran Toksari, Ertan Güner: Reply to note on The common due-date early/tardy scheduling problem on a parallel machine under the effects of time-dependent learning and linear and nonlinear deterioration. Expert Syst. Appl. 39(7): 6657-6658 (2012) | |
| 2011 | ||
| j13 | M. Duran Toksari: A branch and bound algorithm for minimizing makespan on a single machine with unequal release times under learning effect and deteriorating jobs. Computers & OR 38(9): 1361-1365 (2011) | |
| j12 | M. Duran Toksari, Daniel Oron, Ertan Güner: Joint reply to the erratum and the note on "Single machine scheduling problems under the effects of nonlinear deterioration and time-dependent learning" [Math. Comput. Modelling 50 (2009) 401-406]. Mathematical and Computer Modelling 54(1-2): 849-851 (2011) | |
| j11 | Mohamed M. Mostafa, M. Duran Toksari: Market segmentation of organ donors in Egypt: a bio-inspired computational intelligence approach. Neural Computing and Applications 20(8): 1229-1247 (2011) | |
| 2010 | ||
| j10 | M. Duran Toksari, Ertan Güner: The common due-date early/tardy scheduling problem on a parallelmachine under the effects of time-dependent learning and linear and nonlinear deterioration. Expert Syst. Appl. 37(1): 92-112 (2010) | |
| j9 | M. Duran Toksari, Selçuk Kürsat Isleyen, Ertan Güner, Ömer Faruk Baykoç: Assembly line balancing problem with deterioration tasks and learning effect. Expert Syst. Appl. 37(2): 1223-1228 (2010) | |
| j8 | M. Duran Toksari, Daniel Oron, Ertan Güner: Some scheduling problems with past sequence dependent setup times under the effects of nonlinear deterioration and time-dependent learning. RAIRO - Operations Research 44(2): 107-118 (2010) | |
| 2009 | ||
| j7 | Saadettin Erhan Kesen, M. Duran Toksari, Zülal Güngör, Ertan Güner: Analyzing the behaviors of virtual cells (VCs) and traditional manufacturing systems: Ant colony optimization (ACO)-based metamodels. Computers & OR 36(7): 2275-2285 (2009) | |
| j6 | M. Duran Toksari, Ertan Güner: Parallel machine earliness/tardiness scheduling problem under the effects of position based learning and linear/nonlinear deterioration. Computers & OR 36(8): 2394-2417 (2009) | |
| j5 | M. Duran Toksari: Minimizing the multimodal functions with Ant Colony Optimization approach. Expert Syst. Appl. 36(3): 6030-6035 (2009) | |
| j4 | M. Duran Toksari, Daniel Oron, Ertan Güner: Single machine scheduling problems under the effects of nonlinear deterioration and time-dependent learning. Mathematical and Computer Modelling 50(3-4): 401-406 (2009) | |
| 2008 | ||
| j3 | M. Duran Toksari: Taylor series approach to fuzzy multiobjective linear fractional programming. Inf. Sci. 178(4): 1189-1204 (2008) | |
| 2006 | ||
| j2 | M. Duran Toksari: Ant colony optimization for finding the global minimum. Applied Mathematics and Computation 176(1): 308-316 (2006) | |
| j1 | Nihan Çetin Demirel, M. Duran Toksari: Optimization of the quadratic assignment problem using an ant colony algorithm. Applied Mathematics and Computation 183(1): 427-435 (2006) | |
| 1 | Ömer Faruk Baykoç | |
| 2 | Nihan Çetin Demirel (Nihan Çetin) | |
| 3 | Ertan Güner | |
| 4 | Zülal Güngör | |
| 5 | Selçuk Kürsat Isleyen | |
| 6 | Saadettin Erhan Kesen | |
| 7 | Mohamed M. Mostafa | |
| 8 | Daniel Oron |
Data released under the ODC-BY 1.0 license — See also our legal information page