| 2013 | ||
|---|---|---|
| j40 | Chin-Chia Wu, Wen-Hung Wu, Juei-Chao Chen, Yunqiang Yin, Wen-Hsiang Wu: A study of the single-machine two-agent scheduling problem with release times. Appl. Soft Comput. 13(2): 998-1006 (2013) | |
| j39 | Yunqiang Yin, Chin-Chia Wu, Wen-Hsiang Wu, Chou-Jung Hsu, Wen-Hung Wu: A branch-and-bound procedure for a single-machine earliness scheduling problem with two agents. Appl. Soft Comput. 13(2): 1042-1054 (2013) | |
| j38 | Wen-Hsiang Wu, Jianyou Xu, Wen-Hung Wu, Yunqiang Yin, I.-Fan Cheng, Chin-Chia Wu: A tabu method for a two-agent single-machine scheduling with deterioration jobs. Computers & OR 40(8): 2116-2127 (2013) | |
| j37 | Yunqiang Yin, T. C. E. Cheng, Jiayin Wang, Chin-Chia Wu: Single-machine common due window assignment and scheduling to minimize the total cost. Discrete Optimization 10(1): 42-53 (2013) | |
| 2012 | ||
| j36 | Yunqiang Yin, Shuenn-Ren Cheng, T. C. E. Cheng, Chin-Chia Wu, Wen-Hsiang Wu: Two-agent single-machine scheduling with assignable due dates. Applied Mathematics and Computation 219(4): 1674-1685 (2012) | |
| j35 | Yunqiang Yin, T. C. E. Cheng, Dehua Xu, Chin-Chia Wu: Common due date assignment and scheduling with a rate-modifying activity to minimize the due date, earliness, tardiness, holding, and batch delivery cost. Computers & Industrial Engineering 63(1): 223-234 (2012) | |
| j34 | Yunqiang Yin, Chin-Chia Wu, Wen-Hsiang Wu, Shuenn-Ren Cheng: The single-machine total weighted tardiness scheduling problem with position-based learning effects. Computers & OR 39(5): 1109-1116 (2012) | |
| j33 | Yunqiang Yin, Wen-Hsiang Wu, Shuenn-Ren Cheng, Chin-Chia Wu: An investigation on a two-agent single-machine scheduling problem with unequal release dates. Computers & OR 39(12): 3062-3073 (2012) | |
| j32 | Yunqiang Yin, Dehua Xu, Shuenn-Ren Cheng, Chin-Chia Wu: A generalisation model of learning and deteriorating effects on a single-machine scheduling with past-sequence-dependent setup times. Int. J. Computer Integrated Manufacturing 25(9): 804-813 (2012) | |
| j31 | Yunqiang Yin, Shuenn-Ren Cheng, Chin-Chia Wu: Scheduling problems with two agents and a linear non-increasing deterioration to minimize earliness penalties. Inf. Sci. 189: 282-292 (2012) | |
| j30 | Peng-Jen Lai, Chin-Chia Wu, Wen-Chiung Lee: Single-machine scheduling with logarithm deterioration. Optimization Letters 6(8): 1719-1730 (2012) | |
| 2011 | ||
| j29 | T. C. Edwin Cheng, Wen-Hsiang Wu, Shuenn-Ren Cheng, Chin-Chia Wu: Two-agent scheduling with position-based deteriorating jobs and learning effects. Applied Mathematics and Computation 217(21): 8804-8824 (2011) | |
| j28 | Chin-Chia Wu, Wen-Chiung Lee, Yau-Ren Shiau: A Single-Machine deteriorating Job Scheduling Problem with a Non-Regular Criterion. APJOR 28(3): 349-359 (2011) | |
| j27 | T. C. Edwin Cheng, Shuenn-Ren Cheng, Wen-Hung Wu, Peng-Hsiang Hsu, Chin-Chia Wu: A two-agent single-machine scheduling problem with truncated sum-of-processing-times-based learning considerations. Computers & Industrial Engineering 60(4): 534-541 (2011) | |
| j26 | Chin-Chia Wu, Yunqiang Yin, Shuenn-Ren Cheng: Some single-machine scheduling problems with a truncation learning effect. Computers & Industrial Engineering 60(4): 790-795 (2011) | |
| j25 | Der-Chiang Li, Peng-Hsiang Hsu, Chin-Chia Wu, T. C. Edwin Cheng: Two-machine flowshop scheduling with truncated learning to minimize the total completion time. Computers & Industrial Engineering 61(3): 655-662 (2011) | |
| j24 | Chin-Chia Wu, Shih-Ke Huang, Wen-Chiung Lee: Two-agent scheduling with learning consideration. Computers & Industrial Engineering 61(4): 1324-1335 (2011) | |
| j23 | Wen-Chiung Lee, Peng-Jen Lai, Chin-Chia Wu: Some single-machine and flowshop scheduling problems with a non-linear deterioration function. Computers & Mathematics with Applications 62(6): 2487-2496 (2011) | |
| j22 | Wen-Chiung Lee, Shiuan-Kang Chen, Cheng-Wei Chen, Chin-Chia Wu: A two-machine flowshop problem with two agents. Computers & OR 38(1): 98-104 (2011) | |
| j21 | Chin-Chia Wu, Peng-Hsiang Hsu, Juei-Chao Chen, Nae-Sheng Wang: Genetic algorithm for minimizing the total weighted completion time scheduling problem with learning and release times. Computers & OR 38(7): 1025-1034 (2011) | |
| j20 | Sheng-Fuu Lin, Chin-Chia Wu, Chi-Yao Hsu, Dou-Chih Hsu: An Efficient 3D Model Retrieval Based on Principal Axes Analysis and Feature Integration. IJPRAI 25(4): 583-604 (2011) | |
| 2010 | ||
| j19 | T. C. Edwin Cheng, Wen-Chiung Lee, Chin-Chia Wu: Scheduling problems with deteriorating jobs and learning effects including proportional setup times. Computers & Industrial Engineering 58(2): 326-331 (2010) | |
| j18 | Wen-Chiung Lee, Chin-Chia Wu: A note on optimal policies for two group scheduling problems with deteriorating setup and processing times. Computers & Industrial Engineering 58(4): 646-650 (2010) | |
| j17 | Wen-Chiung Lee, Peng-Jen Lai, Chin-Chia Wu: Erratum to 'Single-machine and flowshop scheduling with a general learning effect model' [Computers & Industrial Engineering 56 (2009) 1553-1558]. Computers & Industrial Engineering 59(1): 181 (2010) | |
| j16 | Chin-Chia Wu, Chin-Liang Liu: Minimizing the makespan on a single machine with learning and unequal release times. Computers & Industrial Engineering 59(3): 419-424 (2010) | |
| j15 | Wen-Chiung Lee, Shiuan-Kang Chen, Chin-Chia Wu: Branch-and-bound and simulated annealing algorithms for a two-agent scheduling problem. Expert Syst. Appl. 37(9): 6594-6601 (2010) | |
| j14 | Wen-Chiung Lee, Peng-Jen Lai, Chin-Chia Wu: Erratum to 'Some single-machine and m-machine flowshop scheduling problems with learning considerations' [Inform. Sci. 179(2009) 3885-3892]. Inf. Sci. 180(6): 1073 (2010) | |
| 2009 | ||
| j13 | Chin-Chia Wu, Wen-Chiung Lee: Single-machine and flowshop scheduling with a general learning effect model. Computers & Industrial Engineering 56(4): 1553-1558 (2009) | |
| j12 | Yu-Hsiang Chung, Han-Chu Liu, Chin-Chia Wu, Wen-Chiung Lee: A deteriorating jobs problem with quadratic function of job lateness. Computers & Industrial Engineering 57(4): 1182-1186 (2009) | |
| j11 | Wen-Chiung Lee, Chin-Chia Wu, Yu-Hsiang Chung, Han-Chu Liu: Minimizing the total completion time in permutation flow shop with machine-dependent job deterioration rates. Computers & OR 36(6): 2111-2121 (2009) | |
| j10 | Chin-Chia Wu, Wen-Chiung Lee: A note on the total completion time problem in a permutation flowshop with a learning effect. European Journal of Operational Research 192(1): 343-347 (2009) | |
| j9 | Wen-Chiung Lee, Chin-Chia Wu, Ming-Fang Liu: A single-machine bi-criterion learning scheduling problem with release times. Expert Syst. Appl. 36(7): 10295-10303 (2009) | |
| j8 | T. C. Edwin Cheng, Peng-Jen Lai, Chin-Chia Wu, Wen-Chiung Lee: Single-machine scheduling with sum-of-logarithm-processing-times-based learning considerations. Inf. Sci. 179(18): 3127-3135 (2009) | |
| j7 | Wen-Chiung Lee, Chin-Chia Wu: Some single-machine and m-machine flowshop scheduling problems with learning considerations. Inf. Sci. 179(22): 3885-3892 (2009) | |
| 2008 | ||
| j6 | Chin-Chia Wu, Yau-Ren Shiau, Wen-Chiung Lee: Single-machine group scheduling problems with deterioration consideration. Computers & OR 35(5): 1652-1659 (2008) | |
| j5 | T. C. Edwin Cheng, Chin-Chia Wu, Wen-Chiung Lee: Some scheduling problems with sum-of-processing-times-based and job-position-based learning effects. Inf. Sci. 178(11): 2476-2487 (2008) | |
| 2004 | ||
| j4 | Wen-Chiung Lee, Chin-Chia Wu, Hua-Jung Sung: A bi-criterion single-machine scheduling problem with learning considerations. Acta Inf. 40(4): 303-315 (2004) | |
| 2003 | ||
| j3 | Chin-Chia Wu, Wen-Chiung Lee: Scheduling linear deteriorating jobs to minimize makespan with an availability constraint on a single machine. Inf. Process. Lett. 87(2): 89-93 (2003) | |
| 2001 | ||
| j2 | Wen-Chiung Lee, Chin-Chia Wu: Minimizing the total flow time and the tardiness in a two-machine flow shop. Int. J. Systems Science 32(3): 365-373 (2001) | |
| 2000 | ||
| j1 | Chin-Chia Wu, Wen-Chiung Lee, Juinn-Ming You: Trade-off solutions in a single-machine scheduling problem for minimizing total earliness and maximum tardiness. Int. J. Systems Science 31(5): 639-647 (2000) | |
Colors in the list of coauthors
Last update Sat May 25 18:03:53 2013 CET by the DBLP Team —
Data released under the ODC-BY 1.0 license — See also our legal information page