| 2013 | ||
|---|---|---|
| j13 | Ye Yang, Qiang Li, Wing-Kin Ma, Jianhua Ge, P. C. Ching: Cooperative Secure Beamforming for AF Relay Networks With Multiple Eavesdroppers. IEEE Signal Process. Lett. 20(1): 35-38 (2013) | |
| i1 | Binyue Liu, Ye Yang, Ning Cai: Optimal Amplify-and-Forward Schemes for Relay Channels with Correlated Relay Noise. CoRR abs/1301.5695 (2013) | |
| 2012 | ||
| j12 | Zhimin He, Fengdi Shu, Ye Yang, Mingshu Li, Qing Wang: An investigation on the feasibility of cross-project defect prediction. Autom. Softw. Eng. 19(2): 167-199 (2012) | |
| j11 | Tao Lu, Jianhua Ge, Ye Yang, Yang Gao: BEP Analysis for DF Cooperative Systems Combined with Signal Space Diversity. IEEE Communications Letters 16(4): 486-489 (2012) | |
| j10 | Tao Lu, Jianhua Ge, Ye Yang, Yang Gao: On Bit Error Performance of Full-Rate Signal Space Cooperative Communication over Nakagami-m Fading Channels. IEEE Communications Letters 16(8): 1224-1227 (2012) | |
| j9 | Wen Zhang, Ye Yang, Qing Wang: A Comparative Study of absent Features and Unobserved Values in Software Effort Data. International Journal of Software Engineering and Knowledge Engineering 22(2): 185-202 (2012) | |
| j8 | Qi Li, Ye Yang, Mingshu Li, Qing Wang, Barry W. Boehm, Chenyong Hu: Improving software testing process: feature prioritization to make winners of success-critical stakeholders. Journal of Software: Evolution and Process 24(7): 783-801 (2012) | |
| j7 | Ye Yang, Tsung-Hui Chang, Wing-Kin Ma, Jianhua Ge, Chong-Yung Chi, Pak-Chung Ching: Noncoherent Bit-Interleaved Coded OSTBC-OFDM with Maximum Spatial-Frequency Diversity. IEEE Transactions on Wireless Communications 11(9): 3335-3347 (2012) | |
| c70 | Hao Zhong, Ye Yang, Jacky W. Keung: Assessing the Representativeness of Open Source Projects in Empirical Software Engineering Studies. APSEC 2012: 808-817 | |
| c69 | Yueming Sun, Ye Yang, He Zhang, Wen Zhang, Qing Wang: Towards evidence-based ontology for supporting Systematic Literature Review. EASE 2012: 171-175 | |
| c68 | Xihao Xie, Wen Zhang, Ye Yang, Qing Wang: DRETOM: developer recommendation based on topic models for bug resolution. PROMISE 2012: 19-28 | |
| 2011 | ||
| j6 | Ye Yang, Jianhua Ge, Yang Gao: Power Allocation for Two-Way Opportunistic Amplify-and-Forward Relaying over Nakagami-m Channels. IEEE Transactions on Wireless Communications 10(7): 2063-2068 (2011) | |
| c67 | Wenjin Wu, Wen Zhang, Ye Yang, Qing Wang: DREX: Developer Recommendation with K-Nearest-Neighbor Search and Expertise Ranking. APSEC 2011: 389-396 | |
| c66 | Wen Zhang, Ye Yang, Qing Wang: On the Predictability of Software Efforts using Machine Learning Techniques. ENASE 2011: 5-14 | |
| c65 | Xinguang Chen, Fengdi Shu, Ye Yang: Software Effort Estimation Model based on Use Case Specification. ENASE 2011: 226-231 | |
| c64 | ||
| c63 | Dandan Wang, Qing Wang, Ye Yang, Qi Li, Haitao Wang, Feng Yuan: "Is It Really a Defect?" An Empirical Study on Measuring and Improving the Process of Software Defect Reporting. ESEM 2011: 434-443 | |
| c62 | Ye Yang, Yefeng Chen: Research on the Probability of Joint Investment Based on Logistic Regression Analysis. ICDMA 2011: 1038-1041 | |
| c61 | ||
| c60 | Qi Li, Barry W. Boehm, Ye Yang, Qing Wang: A value-based review process for prioritizing artifacts. ICSSP 2011: 13-22 | |
| c59 | Wen Zhang, Ye Yang, Qing Wang: Network analysis of OSS evolution: an empirical study on ArgoUML project. EVOL/IWPSE 2011: 71-80 | |
| c58 | Wen Zhang, Ye Yang, Qing Wang: Handling missing data in software effort prediction with naive Bayes and EM algorithm. PROMISE 2011: 4 | |
| c57 | Ye Yang, Lang Xie, Zhimin He, Qi Li, Vu Nguyen, Barry W. Boehm, Ricardo Valerdi: Local bias and its impacts on the performance of parametric estimation models. PROMISE 2011: 14 | |
| c56 | Yanbin Liu, Ye Yang, Qiusong Yang, Mingshu Li: DRiVeR: Diagnosing Runtime Property Violations Based on Dependency Rules. SSIRI (Companion) 2011: 194-201 | |
| e2 | He Zhang, Ye Yang, Reidar Conradi (Eds.): EAST 2011 - Proceeding of the 1st International Workshop on Evidential Assessment of Software Technologies, In conjunction with ENASE 2011, Beijing, China, June 2011. SciTePress 2011, isbn 978-989-8425-58-4 | |
| 2010 | ||
| c55 | Hailong Wang, Juan Li, Qing Wang, Ye Yang: Quantitative Analysis of Requirements Evolution across Multiple Versions of an Industrial Software Product. APSEC 2010: 43-49 | |
| c54 | Jing Du, Ye Yang, Zhongpeng Lin, Qing Wang, Mingshu Li, Feng Yuan: A Case Study on Usage of a Software Process Management Tool in China. APSEC 2010: 443-452 | |
| c53 | Dandan Wang, Qing Wang, Ye Yang, Chenyong Hu: Influencing factors of defect removal: an empirical study based on industrial data. ESEM 2010 | |
| c52 | Dandan Wang, Wen Zhang, Jia Chen, Ye Yang, Qing Wang: EXPRE: a repository for managing software data and experience. ESEM 2010 | |
| c51 | Di Wu, Qi Li, Mei He, Barry W. Boehm, Ye Yang, Supannika Koolmanojwong: Analysis of Stakeholder/Value Dependency Patterns and Process Implications: A Controlled Experiment. HICSS 2010: 1-10 | |
| c50 | Haopeng Zhang, Fengdi Shu, Ye Yang, Xu Wang, Qing Wang: A Fuzzy-Based Method for Evaluating the Trustworthiness of Software Processes. ICSP 2010: 297-308 | |
| c49 | Ekrem Kocaguneli, Gregory Gay, Tim Menzies, Ye Yang, Jacky W. Keung: When to use data from other projects for effort estimation. ASE 2010: 321-324 | |
| c48 | Mei He, He Zhang, Ye Yang, Qing Wang, Mingshu Li: Understanding the Influential Factors to Development Effort in Chinese Software Industry. PROFES 2010: 306-320 | |
| c47 | Zhimin He, Fengdi Shu, Ye Yang, Wen Zhang, Qing Wang: Data Unpredictability in Software Defect-Fixing Effort Prediction. QSIC 2010: 220-226 | |
| c46 | ||
| e1 | Jürgen Münch, Ye Yang, Wilhelm Schäfer (Eds.): New Modeling Concepts for Today's Software Processes, International Conference on Software Process, ICSP 2010, Paderborn, Germany, July 8-9, 2010. Proceedings. Lecture Notes in Computer Science 6195, Springer 2010, isbn 978-3-642-14346-5 | |
| 2009 | ||
| j5 | Lang Gou, Qing Wang, Jun Yuan, Ye Yang, Mingshu Li, Nan Jiang: Quantitative defects management in iterative development with BiDefect. Software Process: Improvement and Practice 14(4): 227-241 (2009) | |
| c45 | Thomas Tan, Qi Li, Barry W. Boehm, Ye Yang, Mei He, Ramin Moazeni: Productivity trends in incremental and iterative software development. ESEM 2009: 1-10 | |
| c44 | Fei Dong, Mingshu Li, Juan Li, Ye Yang, Qing Wang: Effect of staffing pattern on software project: An empirical analysis. ESEM 2009: 23-33 | |
| c43 | Zhongpeng Lin, Fengdi Shu, Ye Yang, Chenyong Hu, Qing Wang: An empirical study on bug assignment automation using Chinese bug data. ESEM 2009: 451-455 | |
| c42 | Jingping Song, Zhiliang Zhu, Ye Yang, Hai Yu, Mengmeng Li: Research and Implementation of Embedded Intelligent Network Self-Healing Equipment Based on E1 Link. HIS (2) 2009: 229-234 | |
| c41 | Yanan Gao, Dancheng Li, Zhezhu Li, Ye Yang: Research and Implementation of Data Saving Scheme of Network Topology. HIS (2) 2009: 332-335 | |
| c40 | Hao Jia, Fengdi Shu, Ye Yang, Qi Li: Data transformation and attribute subset selection: Do they help make differences in software failure prediction? ICSM 2009: 519-522 | |
| c39 | Qi Li, Mingshu Li, Ye Yang, Qing Wang, Thomas Tan, Barry W. Boehm, Chenyong Hu: Bridge the Gap between Software Test Process and Business Value: A Case Study. ICSP 2009: 212-223 | |
| c38 | ||
| c37 | Ye Yang, Qing Wang, Mingshu Li: Process Trustworthiness as a Capability Indicator for Measuring and Improving Software Trustworthiness. ICSP 2009: 389-401 | |
| c36 | Hao Jia, Fengdi Shu, Ye Yang, Qing Wang: Predicting Fault-Prone Modules: A Comparative Study. SEAFOOD 2009: 45-59 | |
| c35 | Lingjun Kong, Juan Li, Yin Li, Ye Yang, Qing Wang: A Requirement Traceability Refinement Method Based on Relevance Feedback. SEKE 2009: 37-42 | |
| c34 | Lizi Xie, Qing Wang, Junchao Xiao, Yongji Wang, Ye Yang: PP-HAS: A Task Priority Based Preemptive Human Resource Scheduling Method. SEKE 2009: 655-660 | |
| c33 | Jing Du, Ye Yang, Qing Wang: An Analysis for Understanding Software Security Requirement Methodologies. SSIRI 2009: 141-149 | |
| 2008 | ||
| j4 | Ye Yang, Yongji Wang, Shuang-Hua Yang: Design of a networked control system with random transmission delay and uncertain process parameters. Int. J. Systems Science 39(11): 1065-1074 (2008) | |
| c32 | Mei He, Ye Yang, Qing Wang, Mingshu Li: An Investigation on Performance of Software Enhancement Projects in China. APSEC 2008: 67-74 | |
| c31 | Ye Yang, Mei He, Mingshu Li, Qing Wang, Barry W. Boehm: Phase distribution of software development effort. ESEM 2008: 61-69 | |
| c30 | Shujian Wu, Qing Wang, Ye Yang: Quantitative analysis of faults and failures with multiple releases of softpm. ESEM 2008: 198-205 | |
| c29 | Qi Li, Qing Wang, Ye Yang, Mingshu Li: Reducing biases in individual software effort estimations: a combining approach. ESEM 2008: 223-232 | |
| c28 | ||
| c27 | Junchao Xiao, Qing Wang, Mingshu Li, Ye Yang, Fan Zhang, Lizi Xie: A constraint-driven human resource scheduling method in software development and maintenance process. ICSM 2008: 17-26 | |
| c26 | Ye Yang, Qi Li, Mingshu Li, Qing Wang: An empirical analysis on distribution patterns of software maintenance effort. ICSM 2008: 456-459 | |
| c25 | Thomas Tan, Mei He, Ye Yang, Qing Wang, Mingshu Li: An Analysis to Understand Software Trustworthiness. ICYCS 2008: 2366-2371 | |
| c24 | Zhiliang Zhu, Jingping Song, Aoshuang Dong, Hai Yu, Ye Yang: Research and Analysis of Securities Market based on Multi-Fractal Generator. ICYCS 2008: 2776-2781 | |
| c23 | Xuehui Luo, Ye Yang, Xia Li: Solving TSP with Shuffled Frog-Leaping Algorithm. ISDA (3) 2008: 228-232 | |
| c22 | Fei Dong, Mingshu Li, Yuzhu Zhao, Juan Li, Ye Yang: Software Multi-project Resource Scheduling: A Comparative Analysis. ICSP 2008: 63-75 | |
| c21 | Yin Li, Juan Li, Ye Yang, Mingshu Li: Requirement-Centric Traceability for Change Impact Analysis: A Case Study. ICSP 2008: 100-111 | |
| c20 | Shen Zhang, Yongji Wang, Ye Yang, Junchao Xiao: Capability Assessment of Individual Software Development Processes Using Software Repositories and DEA. ICSP 2008: 147-159 | |
| c19 | ||
| c18 | Mei He, Mingshu Li, Qing Wang, Ye Yang, Kai Ye: An Investigation of Software Development Productivity in China. ICSP 2008: 381-394 | |
| c17 | Jian Zhai, Qiusong Yang, Ye Yang, Junchao Xiao, Qing Wang, Mingshu Li: Automated Process Quality Assurance for Distributed Software Development. SEAFOOD 2008: 196-210 | |
| 2007 | ||
| j3 | Ye Yang, Barry W. Boehm: Improving process decisions in COTS-based development via risk-based prioritization. Software Process: Improvement and Practice 12(5): 449-460 (2007) | |
| c16 | Da Yang, Barry W. Boehm, Ye Yang, Qing Wang, Mingshu Li: Coping with the Cone of Uncertainty: An Empirical Study of the SAIV Process Model. ICSP 2007: 37-48 | |
| c15 | Mei He, Ye Yang, Qing Wang, Mingshu Li: Cost Estimation and Analysis for Government Contract Pricing in China. ICSP 2007: 134-146 | |
| 2006 | ||
| j2 | Hoh Peter In, Jongmoon Baik, Sangsoo Kim, Ye Yang, Barry W. Boehm: A quality-based cost estimation model for the product line life cycle. Commun. ACM 49(12): 85-88 (2006) | |
| c14 | ||
| c13 | Ye Yang, Barry W. Boehm, Betsy Clark: Assessing COTS integration risk using cost estimation inputs. ICSE 2006: 431-438 | |
| c12 | Ye Yang, Barry W. Boehm: Optimizing Process Decision in COTS-Based Development Via Risk Based Prioritization. SPW/ProSim 2006: 64-71 | |
| c11 | Dan Wu, Ye Yang: Towards an Approach for Security Risk Analysis in COTS Based Development. SPW/ProSim 2006: 124-131 | |
| 2005 | ||
| j1 | Ye Yang, Jesal Bhuta, Barry W. Boehm, Daniel Noah Port: Value-Based Processes for COTS-Based Applications. IEEE Software 22(4): 54-62 (2005) | |
| c10 | Barry W. Boehm, Ye Yang, Jesal Bhuta, Daniel Port: Composable Spiral Processes for COTS-Based Application Development. ICCBSS 2005: 6-7 | |
| c9 | ||
| c8 | Xiaolang Yan, Ying Qin, Ye Yang, Haitong Ge: A high performance architecture of EBCOT encoder in JPEG 2000. ISCAS (1) 2005: 492-495 | |
| c7 | Xing Qin, Xiaolang Yan, Haitong Ge, Ye Yang: A simplified algorithm of JPEG2000 rate control for VLSI implementation. ISCAS (6) 2005: 6316-6319 | |
| c6 | Meng Huang, Liguang Yang, Ye Yang: A Development Process for Building OSS-Based Applications. ISPW 2005: 122-135 | |
| c5 | ||
| 2004 | ||
| c4 | ||
| c3 | Barry W. Boehm, A. Winsor Brown, Raymond J. Madachy, Ye Yang: A Software Product Line Life Cycle Cost Estimation Model. ISESE 2004: 156-164 | |
| 2003 | ||
| c2 | Barry W. Boehm, Daniel Port, Ye Yang, Jesal Bhuta: Not All CBS Are Created Equally: COTS-Intensive Project Types. ICCBSS 2003: 36-50 | |
| c1 | Barry W. Boehm, Daniel Port, Ye Yang, Jesal Bhuta, Chris Abts: Composable Process Elements for Developing COTS-Based Applications. ISESE 2003: 8-17 | |
Colors in the list of coauthors
Last update Sat May 18 22:47:11 2013 CET by the DBLP Team —
Data released under the ODC-BY 1.0 license — See also our legal information page